My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Recology San Mateo County
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Recology San Mateo County
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:07:41 AM
Creation date
11/29/2010 2:49:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Recology San Mateo County
PROJECT NAME
Franchise Agreement for Recyclable Materials, Organic Materials, and Solid Waste Collection Services
RMP File Number
801
Date
5/25/2010
Reso Ref
15021, 15303 for Amendment No. 1
MO Ref
13-197 for Amendment No. 1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br /> Appendix 1: Methodology checklist <br /> Roles and responsibilities <br /> • sampling crew manager — responsible for identifying selected samples, <br /> working with Facility staff and the sampling crew, quality control, and <br /> compliance with Facility regulations. <br /> • sampling crew — responsible for sorting samples. <br /> • MRF manager — responsible for coordinating with the sampling crew <br /> manager, SBWMA, and drivers. <br /> • scale house staff — responsible for identifying selected vehicles, distributing <br /> sample placards, and directing drivers towards the sampling area. <br /> • tipping floor staff— creating a designated sampling and sorting area, and <br /> ensuring segregation of selected loads in that area. <br /> • loader operator(s) — responsible for segregating the selected load from other <br /> Toads in the designated sampling and sorting area. <br /> • project manager — responsible for managing the sampling process. <br /> • facility manager — responsible for managing day -to -day operations at the <br /> Designated Transfer and Processing Facility. <br /> • Contractor- - responsible for informing the scale house staff of Toad origin <br /> and type and for passing sample placards to the sampling crew manager. <br /> Advanced Preparation <br /> E Project Manager <br /> Li Contact MRF manager <br /> Li Confirm study dates <br /> E Ask MRF manager to update the following employees with the <br /> sampling plan: <br /> • scale house staff <br /> u loader operator(s) <br /> tipping house staff <br /> Contractor <br /> Any other affected staff <br /> u Share study quotas <br /> i Request expected traffic volumes <br /> r i Request safety expectations <br /> Li Schedule safety training <br /> E Ask if there are any circumstances that may affect the study (i.e., <br /> weather, animals, site construction, etc.) <br /> I Obtain safety gear (Appendix 3) <br /> Li Check safety gear <br /> E Obtain sorting equipment (Appendix 3) <br /> D Check sorting equipment <br /> I Develop and print daily sampling quotas (Appendix 2) <br /> i I Develop and print vehicle selection sheets (Appendix 2) <br /> ❑ Print tally sheets (Appendix 2) <br /> u Print on "Rite in the Rain" all- weather paper <br /> Franchise Agreement for Collection Services with Recology San Mateo County Attachment E -2 <br /> Redwood City Page 11 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.