My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Recology San Mateo County
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Recology San Mateo County
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 11:07:41 AM
Creation date
11/29/2010 2:49:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Recology San Mateo County
PROJECT NAME
Franchise Agreement for Recyclable Materials, Organic Materials, and Solid Waste Collection Services
RMP File Number
801
Date
5/25/2010
Reso Ref
15021, 15303 for Amendment No. 1
MO Ref
13-197 for Amendment No. 1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> ATTACHMENT N <br /> CONTRACTOR'S COMPENSATION AND OPERATING STATISTICS <br /> EXAMPLE CALCULATION OF CONTRACTOR'S COMPENSATION FOR RATE YEAR ONE <br /> (2011) AND ALLOCATION OF 2011 COSTS AMONG MEMBER AGENCIES <br /> The basic principles by which Contractor's Compensation is to be determined each year are <br /> contained in Article 11 of the Agreement. <br /> Attachment K to the Agreement describes in more detail the procedures which will be used to <br /> 9 p <br /> adjust Contractor's Compensation annually and to allocate it, and specified Pass - Through costs, <br /> among the Member Agencies. The first column in Table 1 of Attachment K describes the steps by <br /> which the various components of Contractor's Cost of Operations and Contractor's Pass - Through <br /> Costs, as proposed in 2008 dollars, will be adjusted in 2010 to reflect inflationary and other <br /> changes which have occurred since March 2008 and /or are projected to occur by 2011. Table 1 <br /> also describes the steps by which the same components of Cost of Operations and Contractor's <br /> Pass - Through Costs will be adjusted in each succeeding year during the Term. <br /> This Attachment N is intended to illustrate the initial adjustment of costs from 2008 to 2011 and the <br /> allocation of the 2011 adjusted costs, Profit and Pass - Through Costs (which together comprise the <br /> 2011 Revenue Requirement) among the Member Agencies. Subsequent annual adjustments will <br /> follow a similar, though simpler, process described in the second column of Table 1 in Attachment <br /> K. <br /> The dollar amounts contained in the various forms contained in Attachment N are intended to <br /> provide concrete illustrations of the process that will be followed by Contractor in preparing its <br /> Application for 2011 Contractor's Compensation and by SBWMA in reviewing that Application. <br /> They are not intended to be predictive of the results of that process. In almost all cases, the 2011 <br /> forecasts in Attachment N have been developed, in part, on the basis of estimated Bureau of Labor <br /> Statistics index levels for the period from July 2009 to June 2010. They also are based on <br /> assumed changes in services levels, the actual data for which will not be available until 2010. <br /> Moreover, the figure used for the largest component of Pass - Through Costs (the SBWMA charges <br /> for use of the Shoreway Facility) are in 2008 values. Finally, the metrics used to allocate the <br /> forecasted 2011 costs among Member Agencies (e.g., number of customers, number of route <br /> miles, number of containers, tonnage, etc.) use data as of February 2008; the compensation <br /> adjustments made in 2010 will use more current data. <br /> The components of Attachment N, and a brief description of each, are as follows: <br /> Form A: Contractor's Compensation - SBWMA Summary <br /> This table shows the change, in amount and percentage, between the elements of <br /> Contractor's Compensation as proposed in 2008 dollars, and as forecast to be in effect in <br /> 2011 on a total SBWMA Service Area basis. <br /> Form B: Projected Contractor's Compensation in 2011 by Service Sector <br /> This table distributes the total Contractor's Compensation forecast for 2011 (Form A) <br /> among the three (3) "Service Sectors" (Single - Family Residential, Multi - Family Residential <br /> and Commercial, and Member Agency Facilities). <br /> Form C: Projected 2011 Revenue Requirement by Member Agency <br /> This table allocates the Contractor's Compensation forecast for 2011 (Form A) and <br /> unadjusted 2008 Pass - Through Costs among the Member Agencies. The allocation is <br /> FRANCHISE AGREEMENT FOR COLLECTION SERVICES WITH RECOLOGY SAN MATEO PAGE 1 OF 38 <br /> ATTACHMENT N - CONTRACTOR'S COMPENSATION <br /> CITY OF REDWOOD CITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.