My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> 6.3A ' <br /> Page 9 <br /> LIST OF ATTACHMENTS <br /> 1. Definitions <br /> 2-A. List of MRF Sorting Equipment Showing Manufacturer, Model Number, <br /> Description <br /> 2-B. Latest Version of Site Plan for Shoreway Recycling and Disposal Center <br /> 2-C. Plan Drawings of New MRF Sorting Equipment <br /> 2-D. MRF and Transfer Station Materials Flow Diagram <br /> 2-E. Contamination Measurement Methodology: Singfe Loads <br /> 2-F. MRF Equipment Acceptance Test <br /> 2-G. Product Quality Standards <br /> 2-H. Quarterly Contamination Measurement Methodology <br /> 3. General Operating Standards and Procedures <br /> 4. Contractor's Implementation and Operating Plan <br /> 5-A. General Site Map/Shared Use Facility <br /> 5-B. Detailed Site and Building Plans and Parking Areas <br /> 6. Permits <br /> 7. Hazardous Waste Exclusion Plan (HWEP) <br /> 8-A. Authority-Supplied Stationary Equipment <br /> 8-B. Contractor-Supplied Equipment List <br /> 9. Contractor Staffing Plan <br /> 10. Liquidated Damages <br /> 11-A. Materials Marketing Plan <br /> 11-B. Price Assurance Mechanism <br /> 11-C. Moisture Measurement <br /> 12-A. Procedure for Initial Rate Adjustment Process <br /> 12-B. Sample Calculation of Initial Rate Adjustment Process <br /> 12-C. Modification of Basic Compensation During Interim Operations in Rate Year One <br /> 12-D. Final Cost Forms <br /> 13-A. Procedure for Annual Rate Adjustment Process <br /> 13-B. Sample Calculation of Annual Rate Adjustment Process <br /> 14. Self-Haul Reconciliation Formula <br /> 15. Reports to be Provided by Contractor <br /> 16. Performance Bond and Continuation Certificate <br /> 17. Guaranty <br /> 18. Contractor's Safety Plan <br /> 19. Self-Haul Diversion Plan <br /> Operating Agreement for Shoreway Center 7l30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.