My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� I <br /> 6.3A <br /> Page 36 <br /> 7•0% - 7.9% 3% increase (becomes 28°�) <br /> 6.0% - 6.9% 4% increase (becomes 29%) <br /> 5.0% - 5.9% 5% increase (becomes 30%) <br /> 4.0% - 4.9% 6% increase (becomes 31 %) <br /> <3.9% 7% increase (becomes 32%) <br /> 1 <br /> 2 The amounts due the Contractor pursuant to Section 7.07.D.3 will be <br /> 3 calculated annually on a Rate Year basis, and paid as provided in Section <br /> 4 8.08. <br /> 5 7.08 DIVERSION GUARANTEE. <br /> 6 A. Transfer Station Diversion ProQram. As an incentive to Contractor to Divert Self-haul <br /> 7 materials from disposal, the Contractor's Compensation may be adjusted <br /> S (decreased) based on its performance in diverting from the Disposal Facility, material <br /> 9 delivered to the Transfer Station by self-haul customers. The Contractor has <br /> 10 guaranteed the diversion of a minimum of 30,000 Tons annually (the "Minimum Self- <br /> 11 Haul Diversion Guarantee°). The 30,000 Tons per year Minimum Self-haul Diversion <br /> 12 Guarantee amount shall not include Self-haul Plant Materials (Self—haul Diversion <br /> 13 shall be equal to the annual Tons of Diverted Self-haul materials less the Tons of <br /> 14 Diverted Self-haul Plant Materials). If Contractor fails to achieve the Minimum Self- <br /> 15 Haul Diversion Guarantee in any Rate Year, the Contractor will pay the Authority <br /> 16 (through the rate structure) Seventy Dollars ($70.00) for each Ton below 30,000 <br /> 17 Tons. <br /> 18 If the Contractor does not meet the Minimum Self-Haul Diversion Guarantee, the <br /> 19 Authority may require Contractor to prepare and submit a plan detailing the changes <br /> 20 in equipment, personnel and/or practices that Contractor will employ to achieve the <br /> 21 Minimum Self-Haul Diversion Guarantee. <br /> 22 The amounts due Authority pursuant to Sections 7.08.A will be calculated annually <br /> 23 on a Rate Year basis, and paid as provided in Section 8.08. <br /> 24 If the Authority approves the Optional Transfer Station Processing System. described <br /> 25 in Section 5.18.E, then the parties will mutually agree on a reduction in, or <br /> 26 elimination of the requirements in subsection A. <br /> 27 <br /> 28 B. MRF Residual . As an incentive to Contractor to increase recovery efficiency at the <br /> 29 MRF, the Contractor will be responsible for paying (a) the amount charged at the <br /> 30 Designated Disposal Site for accepting and disposing of residue from the MRF (the <br /> 31 current tip fee at Ox Mountain is $33.24 per Ton), and (b) the Transportation Fee <br /> 32 per Ton/Mile attributable to delivering MRF residue to the Disposal Site. The cost of <br /> 33 disposal of MRF residue will be deducted monthly from tF�e MRF Payment provided <br /> 34 in Section 7.03.B. Materials in a load that constitute contamination in excess of the <br /> 35 applicable limitation, as identified by an audit of that load, are not counted as <br /> 36 residue for purposes of this section or Section 7.07.D.3. <br /> 37 7.09 REIMBURSEMENT OF PASS-THROUGH COSTS <br /> 38 Contraetor will pay the following costs and will be reimbursed by Authority with no <br /> 39 allowance for overhead or profit: <br /> Operating Agreement for Shoreway Center <br /> Page - 27 - 7�30�09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.