My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3A <br /> Page 54 ', <br /> 1 11.09 EXCUSE FROM PERFORMANCE <br /> 2 A. Force Maieure. Neither party shall be in default of its obligations under this <br /> 3 Agreement in the event, and for so long as, it is impossible or extremely <br /> 4 impracticable for it to perform its obligations due to an °act of God" (including, but ' <br /> 5 not limited to, flood, earthquake or other catastrophic events that have taken place <br /> 6 at or in close proximity to the Shoreway Center), war, insurrection, riot, labor unrest <br /> 7 of other than the party's employees (including strike, work stoppage, slowdown, sick <br /> 8 out, picketing, or other concerted job action), or other similar cause not the fault of, <br /> 9 and beyond the reasonable control of, the party claiming excuse. A party claiming <br /> l0 excuse under this Section must (1) have taken reasonable precautions, if possible, <br /> 11 to avoid being affected by the cause, and (2) notify the other party in writing as <br /> 12 provided in Subsection C. This Section 11.09 A shall not apply to, nor shall it <br /> 13 excuse any failure to satisfy or perform an obligation arising from, any "act of God," <br /> 14 catastrophic event, war, insurrection, riot, labor unrest or similar cause that does not <br /> 15 directly and immediately impact or affect Contractor's operations at the Shoreway <br /> 16 Center. Indirect impacts and effects f�om such events and/or causes at remote <br /> 17 locations and times are not intended to be included as "acts of God" or an event of <br /> 18 Force Majeure under this Section 11.09. <br /> 19 B. Obliqation to Restore Abilitv to Perform. Any suspension of performance by a party <br /> 20 pursuant to this Section shall be only to the extent, and fo� a period of no longer <br /> 21 duration than, required by the nature of the event, and the party claiming excuse <br /> 22 shall use its best efforts to remedy its inability to perForm as quickly as possible and <br /> 23 to mitigate damages that may occur as result of the event. <br /> 24 C. Notice. The party claiming excuse shall deliver to the other party a written notice of <br /> 25 intent to claim excuse from performance under this Agreement by reason of an <br /> 26 event of Force Majeure. Notice required by this Section shall be given promptly in <br /> 27 light of the circumstances, but in any event not later than five (5) days after the <br /> 28 occurrence of the event of Force Majeure. Such notice shall describe in detail the <br /> 29 event of Force Majeure claimed, the services impacted by the claimed event of <br /> 30 Force Majeure, the expected length of time that the party expects to be prevented <br /> 31 from pertorming, the steps which the party intends to take to restore its ability to <br /> 32 perform, and such other information as the other party reasonably requests. <br /> 33 D. Authorit�s Riqhts in the Event of Force Maieure. The partial or complete <br /> 34 interruption or discontinuance of Contractor's services caused by an event of Force <br /> 35 Majeure shall not constitute a Contractor Default. Notwithstanding the foregoing: (i) <br /> 36 the Authority shall have the right to make use of Contractor's facilities and <br /> 37 equipment in the event of non-perFormance excused by Force Majeure; (ii) if <br /> 38 Contractor's failure to perform by reason of Force Majeure continues for a period of <br /> 39 thirty (30) days or more, the Authority shall have the right to immediately terminate <br /> 40 this Agreement; (iii) if Contractor is unable to process and dispose of Solid Waste or <br /> 41 arrange for recovery of Recyclable Materials as required by this Agreement for a <br /> 42 period of finro (2) or more consecutive days or for any three (3) days in a seven <br /> 43 (7)-day pe�iod as a result of Force Majeure, the Authority shall have the right to <br /> 44 make use of Contractor's property, and (iv) if Contractor's inability to process and <br /> 45 dispose of Solid Waste or arrange for recovery of Recyclable Materials continues <br /> 46 for ten (10) days or more from the date by which Contractor gave or should have <br /> 47 given notice under Subsection C, the Authority may terminate this Agreement. <br /> Operating Agreement for Shoreway Center <br /> Page - 45 - 7130�09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.