My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I � <br /> 6.3A <br /> Page 65 <br /> ATTACHMENT 3 <br /> GENERAL OPERATING STANDARDS AND PROCEDURES <br /> 1. GENERAL OPERATING STANDARDS AND SERVICES TO BE PROVIDED <br /> A. Inspection of Loads. The Contractor will inspect all inbound materials at the <br /> time of dumping to ensure that the load does not contain any hazardous <br /> materials or other materials that are not accepted at the Shoreway Center. . <br /> B. Ownership of Materials. Once the vehicles have dumped and the trucks have left <br /> the Shoreway Center, the ownership and responsibility for the proper <br /> management of the materials resides with the Contractor. The Contractor <br /> remains responsible for the materials until the Designated Disposal Site, <br /> Designated Processing Facility, or materials buyers take ownership. The <br /> AUTHORITY assumes no ownership or responsibility for the proper management ' <br /> of materials at the Shoreway Center. <br /> C. Contractor's Use of Premises. Contractor shall use the Shoreway Center only for <br /> the processing of Solid Waste, Organic Materials, and Recyclable Materials <br /> I delivered under this Agreement and for directly related support purposes. The <br /> Contractor will not bring-in or cause to be brought-in, other materials to the <br /> Shoreway Center without prior written approval of the AUTHORITY. � <br /> D. Tipqina Area. Contractor will keep the MRF and transfer station tip areas open <br /> and clear of piles to the extent necessary so that safety and material tipping is �, <br /> optimized. <br /> E. Vehicle Turnaround. Contractor will be required to maintain operating efficiency <br /> within the transfer station, MRF and Public Recycling Center to ensure I <br /> customers and other vehicles are able to dump materials quickly and in <br /> accordance with the Vehicle Turnaround Guarantee as described in Article 5.14. <br /> F. Off-site Impacts. Contractor will operate the Shoreway Center to minimize the off- <br /> site impacts (e.g., litter, odor, traffic, noise) of the Shoreway Center operations. <br /> Correction of off-site impacts that result from the operations of the Shoreway <br /> Center by the Contractor will be the responsibility of the Contractor. Contractor <br /> will make every effort to prevent vehicles from stacking onto Shoreway Road. If <br /> vehicles stack off the Shoreway Center property, the Contractor is responsible for <br /> providing personnel to control traffic and ensure that through-traffic on Shoreway <br /> Road is not impeded. <br /> G. Care of Shorewav Center. Contractor will use the structures and operate the I <br /> facilities in such a way that minimizes Shoreway Center and equipment wear. <br /> H. Safetv Plan. The Contractor will implement the Safety Plan, included as <br /> Attachment 18 (including specific safety protocols for all Shoreway Center <br /> workers, drivers of commercial vehicles, customers and site visitors), implement <br /> a training program, maintain an on-going schedule for safety review meetings <br /> with mandatory attendance by all regular employees (as well as periodic trainings <br /> for new-hires or temporary workers), and maintain documentation of the Safety <br /> Plan activities. <br /> Facility Agreement, Attachment 3 <br /> General OperaHng Shandards and Procedurea <br /> Page 1 of 13 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.