Laserfiche WebLink
6.3A <br /> Page 74 <br /> materials including plant material and food scraps. The Contractor will haul to <br /> these Designated Disposal and Processing Facilities unless otherwise directed in <br /> writing by the AUTHORITY. <br /> B. The AUTHORITY will provide the Contractor 60 days notice if it intends to <br /> redirect Solid Waste, C&D, Organic Materials, Bunker Program Materials to a <br /> new Designated Disposal Site or Processing Facility. The Contractor's <br /> transportation compensation will be adjusted for any haul cost differential, should <br /> the AUTHORITY redirect materials to another site or facility <br /> C. Contractor will ensure that the transport trailers are compatible with the tippers <br /> and operations at the Designated Disposal Site and Designated Processing <br /> Facilities. <br /> i <br /> D. Contractor must provide su�cient back-up capability (drivers and equipment) in l <br /> its transfer fleet to minimi2e disruption during normal business hours due to <br /> scheduled preventive maintenance and/or unscheduled equipment breakdown. <br /> 5. MATERIALS RECOVERY FACILITY OPERATIONS <br /> A. The Contractor will process all Targeted Recyclable Materials delivered by the <br /> Collection Contractor, by buyback and drop-off center customers and other <br /> customers approved by the AUTHORITY. <br /> B. The Contractor will keep the MRF tipping area open and clear of piles so that <br /> material tipping is not hampered and vehicle traffic can safely and efficientfy <br /> dump loads. <br /> C. Contractor will inspect all inbound materials at the time of delivery and ensure <br /> that loads contain only Targeted Recyclable Materials, other materials permitted <br /> to be processed at the MRF and allowable levels of contamination. . <br /> D. Residue from the MRF sorting operations will be weighed and recorded prior to <br /> being transpor#ed to the transfer station. The weight of all Residue (and each <br /> individual residue load) removed from the MRF shall be recorded. The <br /> Contractor will report the Residue generated by the MRF on a monthly basis to <br /> the AUTHORITY. I <br /> E. The Residue generated by the Processing System must be below 10%, provided I <br /> inbound contamination levels are within the 8% commercial and 10% Single �, <br /> Family Residential threshold levels. Any materials that fall to the floor from the <br /> Processing System may be reintroduced to the Processing System for ' <br /> reprocessing. <br /> F. Contractor will transport all Residue to the Designated Disposal Site unless <br /> otherwise directed by the Authority. The costs of handling, transporting and <br /> disposing of MRF Residue will be the responsibility of the Contractor. The <br /> Contractor will not be paid the Transfer Station Fee for Residue handled through <br /> the Transfer Station. <br /> G. The Contractor will sort Recyclable Materials to meet the Product Quality <br /> Standards Attachment 2-G. <br /> Facility Agreement, Attachment 3 <br /> General Operating Standards and Procedures <br /> Page 10 of 13 <br /> i <br />