My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Todd Jersey Architecture
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Todd Jersey Architecture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2010 3:16:51 PM
Creation date
12/14/2010 3:16:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Todd Jersey Architecture
PROJECT NAME
Conceptual Master plan for upgrades and additions to the Veterans Memorial Senior Center, Herkner pool, and related park facilities and infrastructure at Red Morton park.
RMP File Number
304.5
Date
12/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> Itemized List of what Consultant will do for City and at what price and schedule. <br /> Conceptual Master Plan for upgrades and additions to the Veterans Memorial Senior <br /> Center, a new aquatic facility to replace the Herkner Pool, and the development of <br /> related park facilities and infrastructure at the west side of Red Morton Park in <br /> Redwood City, California <br /> Step One: Pre design: <br /> • Meet at park to look at existing conditions, usage patterns and to photo <br /> document site <br /> • Read all existing studies and documents related to project <br /> • Research and Gather information needed from multiple sources <br /> • Meet with YMCA to look at collaborative possibilities <br /> • Discuss possibilities of library at site with key City Staff <br /> • Discuss aquatic project with key stakeholders <br /> • Create initial project scope with timeline and budget <br /> Step Two: Concept master planning and cost estimating <br /> • TJA to create conceptual master plan ideas using various media including clay <br /> massing models, pencil drawings and computer photo montage to demonstrate <br /> those ideas <br /> • TJA to hold meetings as needed for input and by in with key stakeholders <br /> • TJA to finalize conceptual master plan <br /> • TJA to create project description with cost estimate and timeline <br /> Deliverables: <br /> • Scoping report from Step One <br /> • Summary of research from Step One <br /> • Site Plan drawing of Conceptual Master Plan <br /> • Clay Model of Conceptual Master Plan <br /> • Conceptual Master Plan project description, cost estimate and timeline <br /> Agreement over $10K 10 <br /> City Attorney Approved Version 041410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.