My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 R.C. Peninsula Park, LLC (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 R.C. Peninsula Park, LLC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2011 1:43:55 PM
Creation date
12/16/2010 2:59:52 PM
Metadata
Fields
Template:
Agreement
Contractor Name
R.C. Peninsula Park, LLC
PROJECT NAME
Acquisition and Reimbursement Agreement Community Facilities District No. 2010-1 (One Marina)
RMP File Number
304
Date
12/16/2010
Reso Ref
15071 and 15104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B - 2 <br /> OFF -SITE <br /> DISCRETE COMPONENTS OF DISTRICT FACILITIES <br /> AND RELATED BUDGETED COSTS <br /> Note: In this exhibit, each highlighted heading is a facility (i.e. planning and design costs <br /> previously paid, sanitary sewer improvements, domestic water improvements) and each numbered line <br /> listed below a Facility is a discrete component thereof (ie "RW No. 1" and "Roadway No. 2" are each a <br /> discrete component). <br /> Description Costs <br /> PLANNING & DESIGN COSTS PREVIOUSLY PAID <br /> DESIGN/PERMITTING /APPROVALS Costs to Date <br /> PD No. 1: Legal Fees 10,000.00 <br /> PD No. 2: Redwood City Plan Review Fees 84,825.00 <br /> PD No. 3: Performance & Payment Bond Reimbursement Lewis & 3,162.00 <br /> Tibbitts <br /> Total 97,987.00 <br /> STUDIES/ENGINEERING /FEES Costs to date <br /> SE No. 1: Survey /PUE's 7,500.00 <br /> SE No. 2: Geotechnical Investigation & Report 23,529.00 <br /> SE No. 3: Civil Engineering Design (KPFF) 382,591.00 <br /> SE No. 4: Landscape & Irrigation Design (Guzzardo Partnership) 17,932.00 <br /> SE No. 5: Special Consultants 6,818.00 <br /> SE No. 6: PG &E Electrical Design Fees 54,000.00 <br /> SE No. 7: PG &E Gas Design Fees 25,000.00 <br /> SE No. 8: PG &E Joint Trench Design and Form B 8,250.00 <br /> SE No. 9: AT &T Telephone Cabinet Relocation 135,586.00 <br /> SE No. 10: Management Fee 100,000.00 <br /> Total 760,666.00 <br /> BAIR ISLAND ROAD RECONSTRUCTION Costs to Complete <br /> PHASE 1 (Sta. 0 +00 to Sta. 20 +25) <br /> GENERAL CONDITIONS: <br /> GC No. 1: Legal Fees 10,000.00 <br /> GC No. 2: Civil Engineering RFI's & Construction Observations 52,400.00 <br /> GC No. 3: Geotechnical Testing & Observations 34,500.00 <br /> GC No. 4: Redwood City Inspections 20,000.00 <br /> GC No. 5: Erosion Control /SWPPP /BMP 30,400.00 <br /> GC No. 5: Dewatering 30,000.00 <br /> GC No. 6: Construction Staking 17,000.00 <br /> GC No. 7: Traffic Control 20,000.00 <br /> GC No. 8: Wet Utility Demolition & Slurry Filling 80,290.00 <br /> GC No. 9: Temporary Utilities & Services, Printing & Reimbursables, 20,000.00 <br /> Office Expenses, Etc. <br /> Subtotal 314,590.00 <br /> GENERAL CONSTRUCTION ROADWAY: <br /> GCR No. 1: Install the future 20" water main and related appurtenances 29,232.00 <br /> under the Bayshore Freeway (State Hwy 101), extending under the new round- <br /> about and tying -in at the new tee located at Station 9 +16.84. Reference Drawing <br /> No. 10.1. <br /> B2 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.