Laserfiche WebLink
PG &E Gas & Electri«al, Improvements: ;Ali labor, material and equipment costs to <br /> pertaining tothe lonnt tre tre and backflllmg, installation of u nd er ground Complete <br /> electrical vaults, electrical concrete pads,: 'conduits, 6" gas main, and related <br /> appurten`aneea to the PG &E drawing „ and ,theijoint Trench drawings <br /> drawings 111, 71,2, 11.3 and 11.4 and approved by' the5City of Redwood City, <br /> Engineering :4 Construction, on 14 October 2009. -;` <br /> PG &E No. 1: That portion of the work for the joint trench, including 89,918.00 <br /> excavation, backfill and conduits. <br /> PG &E No. 2: That portion of the work for the furnishing & installation of the 63,618.00 <br /> concrete substructures and at grade concrete pads for the new electrical service. <br /> PG &E No. 3: That portion of the work to furnish and install the new 6" gas 48,900.00 <br /> main in the joint trench. <br /> Subtotal 202,436.00 <br /> Landscape & Irrigation Improvements: All labor; material ,. and equipriiient C osts to <br /> pertaining to the installation of ;;filtration. gallery € excavation and ::bacicfilling, Complete <br /> underground drainage piping, drainagee. rock, "landscape..plantings; soil amendments <br /> and fertilizers, irrigation system with controller and fine grading as detailed o n The <br /> GttkzardO Partnership drawings... <br /> L &I No. 1: That portion of the work for a complete irrigation system. 30,750.00 <br /> L &I No. 2: That portion of the work for the excavation and backfill of the 74,237.00 <br /> infiltration galleries and all related underground drainage piping and drainage rock. <br /> L &I No. 3: That portion of the work for all plantings and soil amendments. 55,355.00 <br /> Subtotal 160,342.00 <br /> ,Construction Management Fee <br /> 15% of Subtotal Costs to Complete 382,681.20 <br /> contingency " <br /> 5% of Subtotal Costs to Complete and CM Fee 146,694.46 <br /> TOTAL PHASE 1 <br /> Total 3,080,583. <br /> 66 <br /> BAIR ISLAND ROAD RRECONSTRLICTIQN Esthnated; <br /> `: FUTURE E PlI ASE (Sta. `20 +25"`t6 Property Line) Cost to Complete <br /> General Conditions &General Construction for Future Phase 421,878.00 <br /> Construction Management Fee <br /> 15% of General Conditions & General Construction for Future Phase 63,281.70 <br /> Contingency <br /> 5% of General Conditions & General Construction for Future Phaseand CM 24,257.99 <br /> Fee <br /> TOTAL PHASE 1 <br /> Total 509,417.69 <br /> B2 -4 <br />