My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Huffman-Broadway Group, Inc (2).
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Huffman-Broadway Group, Inc (2).
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2010 1:48:28 PM
Creation date
12/27/2010 1:47:56 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Huffman-Broadway Group, Inc.
PROJECT NAME
Seaport Centre Rip-Rap Replacement Project
RMP File Number
304.5
Date
12/27/2010
Amendment
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Huffman - Broadway Group, inc. Environmental Regulatory Consultants <br /> 828 Mission Avenue, San Rafael, California 94901, USA • (415) 925.2000 • Fax (415) 925.2006 <br /> Sender's e thuffman @h•bgroup.com <br /> October 28, 2010 <br /> Ms. Tanisha Werner <br /> City of Redwood City <br /> Building, Infrastructure, and Transportation Department <br /> 1017 Middlefield Road <br /> Redwood City, CA 94063 <br /> Subject: Proposal for Seaport Centre Rip -Rap Replacement Project <br /> Dear Ms. Tanisha: <br /> Huffman - Broadway Group, Inc. (HBG) is pleased to present our proposal to perform permit <br /> acquisition services for the Seaport Centre Rip -Rap Replacement Project. <br /> HBG proposes to provide regulatory permit services for the Seaport Centre Rip -Rap <br /> Replacement Project. The Project may include the replacement and addition of new rip -rap, soil, <br /> geofabric and /or the use of other bank stabilization techniques recommended by BKF Engineers <br /> to repair and stabilize the bank from further erosion. The eroding bank is approximately 100 feet <br /> adjacent to a public trail and park and is hydrologically connected to the Redwood Creek <br /> Shipping Channel. <br /> The scope of services provided by HBG would be to obtain state and federal authorizations <br /> including a Corps Section 404 Nationwide Permit, San Francisco Bay Regional Water Quality <br /> Control Board (RWQCB) state 401 water quality certification and if required San Francisco Bay <br /> Conservation and Development Commission (BCDC) permit amendment and/or California <br /> Department of Fish and Game (CDFG) Streambed Alteration Agreement. Authorization <br /> pursuant to Section 7 of the federal Endangered Species Act from the United States Fish and <br /> Wildlife Service (USFWS) and National Marine Fisheries Service (NMFS) may also be required <br /> depending on the manner in which work is conducted and types of habitats impacted. <br /> Authorizations from the USFWS and NMFS would be completed under an Endangered Species - <br /> Act Section 7 consultation between the wildlife agencies and the Corps. The consultation with <br /> NMFS would include an Essential Fish Habitat consultation pursuant to the Magnuson- Stevens <br /> Fishery Conservation and Management Act. <br /> HBG's recent work with the City of Redwood City and BKF Engineers on several improvement <br /> projects with similar environmental permitting requirements would be effective in obtaining <br /> authorizations in a cost effective timely manner for the Seaport Centre Rip -Rap Replacement <br /> Project. • <br /> J :U P Seaport Centre \Seaport RFQ I0- 27- 10.doc <br /> 1 !� <br />
The URL can be used to link to this page
Your browser does not support the video tag.