My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MpNITORING VERIFICATION <br /> IDENTIFIED 1MPACT RELATED MITlGAT10N MEASURE Implementation Monitoring and Timing Signature Date <br /> Performance Criteria Entit Verification Entit Re uireme�ts <br /> the historical resource and the effect <br /> may cause a substantial adverse <br /> change in the significance of that <br /> resource, CEQA will require <br /> preparation of a"second tier," site- <br /> specific EIR for that project, unless it <br /> is determined that the significant <br /> impact can be mitigated to a less- <br /> than-significant level. <br /> The City shall refrain from approving a <br /> future project that is determined to <br /> have a significant effect on a historic <br /> resource if it is deiermined that there <br /> are feasible alternatives or mitigation <br /> measures that can substantially <br /> lessen or avoid those effects. if the <br /> City aflirmatively determines that there <br /> are no feasible alternatives or <br /> mitigation measures that will reduce <br /> the effect to a level of insignificance, <br /> the City shall issue a slatement of <br /> overriding considerations. <br /> No purpose can be served by <br /> attempting to prepare such site- <br /> specific project impact assessment at <br /> this first tier stage when future <br /> development projects remain <br /> unspecified and uncertain. <br /> Implementation of mitigation <br /> measures {a) through (f) above can be <br /> expected to reduce the poteniial <br /> adverse impacts to historic resources <br /> from implementation of the DPP to lhe <br /> maximum extent feasible. However, <br /> given the uncertainiy with respect to <br /> the condition of and circumstances <br /> surrounding the historic resources at <br /> the time future development projects <br /> are proposed that would affecl such <br /> resources, and without knowing the <br /> speci(ic design characteristics of such <br /> future develo ment ro osals, the <br /> .. <br /> Page 7 C:IDocumenfs and 3eflingsHpassanis�lLocal SettingslTemporary fnfemet Frles10LK49lmmchf (10671).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.