My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.0 <br /> Extf��3112 <br /> not be impleinented under the No Project Alternative, and therefore the No Project <br /> Alternative is not expected to achieve this goal and objective of the City to the same <br /> , degree as the proposed DPP. <br /> Because the No Project Alternative would not be expected to reduce or avoid any <br /> significant impacts from implementation of the proposed DPP, and because the No i <br /> Project Alternative would not achieve the City's goals and objectives for the downtown <br /> area and the Project to the same degree as the proposed DPP, the No Project Alternative <br /> is not considered a feasible alternative and has been rejected from further consideration. <br /> 2. Alternative 2-- Reduced Development Alternative <br /> a) Findings. Alternative 2, the Reduced Development Alternative, <br /> is described and discussed at pages 19-2 to 19-3 and pages 19-20 to 19-22 of the Draft <br /> EIR. The Draft EIR's authors concluded that Alternative 2 is the environmentally <br /> superior alternative (p. 19-28 to 19-29) because the reduced levels of development would <br /> be expected to result in slightly fewer construction-related impacts, and also would be � <br /> expected to generate slightly fewer vehicle trips, leading to slightly less severe traffic- ' <br /> related impacts. (p. 19-29) However, the proposed mitigation measures are expected to I I <br /> reduce the construction-related impacts to less than significant levels for the proposed <br /> project and for all of the alternatives. In addition, although Alternative 2 could result in <br /> slightly less severe traffio-related impacts, the reduction in the severity of those impacts <br /> would not be significant, and those impacts would remain significant and unavoidable <br /> under Alternative 2. Therefore, as explained below, because Alternative 2 would not be <br /> expected to substantially lessen or avoid any of the proposed Project's significant <br /> impacts, and would not achieve the City's goals and objectives for the Project to the same <br /> degree as the proposed Downtown Precise Plan, the City hereby rejects Alternative 2 as <br /> infeasible. <br /> b) Explanation. The Reduced Development Alternative would <br /> reduce all of the development build-out limits in the proposed DPP by 25 percent, except <br /> for the cap on hotel rooms, which would remain at 200 units. This alternative does not <br /> assume that development would occur on fewer sites or at less density or intensity on any <br /> individual sites as compared to the DPP; rather, the only difference would be that the <br /> cumulative development limits for each land use type (with the lodging room exception <br /> noted above) wouId be lower. (DEIR, Table 19.1 at p. 19-14) <br /> The Reduced Development Alternative would have sianificant unavoidable climate <br /> change impacts that are similar to those projected for the DPP. The DPP area is already <br /> developed, exposing existing structures and residents to the risk of flood level rise and <br /> Alternative 2 would permit additional development with a concomitant population <br /> increase in an area already at risk of impact due to sea level rise, even though at a <br /> somewhat lower net gro��th than the DPP. Therefore, this alternative would not avoid <br /> tliis significai�t unavoidable impact. <br /> S�\RESOLUTIONS\Rcsa 2092 CEQA Pindings for DPY Exhibit R doc 52 <br /> 012011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.