My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> 6.1 C <br /> Page 6 <br /> Mr. Tom Passanisi, AICP <br /> December 17, 2010 � <br /> Page 4 <br /> August 31, 2010) released after the Draft EIR was compieted. In <br /> addiUon, additionai language for EIR Alternative 5--Revised <br /> Historic Resource Preservation Regulations was crafted and <br /> approved by the HRAC at its September 15 meeting, after the Draft <br /> ElR had been released. This DPP and Draft EIR revision cycle <br /> was not anticipated in the approved scope of work. <br /> 7. Extensive Collaboration and Coordination of Final EiR $20,408.08 <br /> (Response to Comrr�ents) Process with City Staff and Outside <br /> Counsel. The attarney who took legal action against the 2007 <br /> DPP EIR was an active participant throughout the Draft EIR review <br /> process (e.g., attending and speaking at public meetings and <br /> hearings, writing three comment letters). The City, its outside <br /> counsel, and Wagstaff/MIG coordinated and collaborated <br /> extensivety on preparation of responses to these many, highly <br /> detalled comments on the Draft EIR. Wagstaff/MIG prepared <br /> thoroughly researched, extensively detailed responses to the Draft <br /> EIR comments for the Final EIR. The approved contract allocated <br /> $17,089 to the Final EIR preparation task; to date, the total cost of <br /> this task has been approximately $37,497. <br /> 8. Anticipated Remaining Scope Items. As of the date of this $8,279.48 <br /> request, the following unbilled additional EIR labor and <br /> miscellaneous costs are anticipated: <br /> a. Reproduction cost of Final EIR = 573.48 <br /> b. WagstafF/MIG preparation and attendance at <br /> one Planning Commission hearing and one City <br /> Council hearing = 3,670.00 <br /> c. Revisions to Final EIR {responses fo <br /> comments and DEIR errata) prior to submittal <br /> to City Council = 1,468.00 <br /> d. Preparation of Mitigation Monitoring and <br /> Reporting Program = 1,468.00 <br /> e. ReproductPon cost of Final EIR (additional copies <br /> for distribution to commenters) = 1,100.00 <br /> Subtotal , 104,412.28 <br /> Budget Remaining 26.26 <br /> Total Additional Cost $104,386.02 <br /> Contingency amount remaining--release requested a17,883.00 <br /> Total contract amendment request (after contingency) �86,503.02 <br /> T.�1106711f�12-17-f0lefter (10871).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.