My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> 6.2A II <br /> � Page 9 <br /> � EXHIBIT A i <br /> SCOP� OF WORK <br /> The Bay Area-Wide Trash Capture Demonstration Project is funded by the State Water Resources Control Board I <br /> Clean Water State Revolving Fund (CWSRT) with funds from the American Reinvestment and Recovery Act <br /> (ARRA). The San Francisco Estuary Partnership (SFEP), a project of the Association of Bay Area Govemments <br /> (ABAG) will administer the project, which will retrofit and/or improve storm drainage infrastructure in order to <br /> address trash pallution in San Francisco Bay and local creeks. <br /> The project will demonstrate to municipalities and the pnblic that trash can be managed, and that reductions in the <br /> volume of trash enhance the Fscuary and its water quality. Municipal staff will gain experience with, and share <br /> information about, different types of trash capture devices. The project will facilitate eatly compliance with the <br /> San Francisco Bay Regional Water Qualiry Control Board's Municipal Regional Stormwater National Pollutant <br /> Discharge Elimination Sysiem Permit affecting Phase I communilies, and anticipaled requirements for operators <br /> of small municipal separate storm sewer systems (Phase II). <br /> SFEP/ABAG has developed an initial distribution of project resources, posted at <br /> I�ttp://www.bayareatrashtrucker.org/contenUcontract-resources, which allocates a proportion of available funds to <br /> all project area municipalities (Exhibit A-1) based on population and regulatory requirement to capture trash. This <br /> allocation will be revised to reflect the municipalities that choose to contract with ABAG and join the project. <br /> SFEP/ABAG has solicited proposals from, and is contracting with vendors to provide trash capture devices for <br /> installation in municipal storni drain systems throughout the project area, in a range of scales and designs <br /> appropriate to different locations and conditions. <br /> All construction must be complete, and all devices installed, by November 1, 2012. <br /> The project completion date (end of project term) is December 1, 2013. <br /> Participating entities that opt to join the project will undertake the following tasks: <br /> l. Contract with the Association of Bay Area Governments to participate in the F3ay Area-wide Trash <br /> Capture Demonstration Project. This contract includes provisions required by both ARRA and the <br /> CWSRF. � <br /> 2. Review the list of vendors and trash capture devices included in the project (Exhibit A-21; identify high <br /> trash-generating locations for ii�stallation of devices; and work with vendors' representatives to select and <br /> size devices appropriate to those sites. Each individual installation must either be covered by the ProjecYs <br /> categorical exemption from requirements of the California Cnvironmental Quality Act (CEQA Guidelines ' <br /> Section 15302(c), Replacement or Reconsttvction), or the municipality must submit to ABAG complete ' <br /> CEQA documentafion that was been duly filed with the Governor's Office of Planning and Research <br /> before September 15, 2009. <br /> 3. Complete a purchase order form (example in Exhibit A-3) for each vendor of selected devices, specifying <br /> devices and locations; sign the form along with the vendor's representative; and submit to the SFEP <br /> project manager. Submit multiple purchase orders if necessary. <br /> 4. Either supervise installation of each device by the vendor; install the device with municipal staff Iabor, or <br /> contract separately with an appropriate installer (using municipal funds unless otherwise arranged with <br /> ABAG legal staf� to place tlie device in accordance with specifications. <br /> 3: When the device is properly insta[led and functioning, complete a Notice of Acceptance (Exhibit A-4) <br /> and submit the ABAG. When a representative of the cily or county signs the Notice of Acceptance, <br /> ownership and responsibility for upkeep and maintenance of the device pass from ABAG to the <br /> municipality. <br /> 6. Display a project placard, to be provided by ABAG, in city/county offices or other appropriate public <br /> space <br /> 7. Maintenance: Municipal staff will perform or supervise appropriate regular maintenance of each device <br /> according to manufacturer's instructions or best practices, Each device will be maintained so as to <br /> maximize effectiveness and minimize both flooding r�nd flow of trash through the stonn drainage system; <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.