My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res11 15086
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2011
>
Res11 15086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 3:51:43 PM
Creation date
1/26/2011 3:51:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/24/2011 <br /> Exhibit B <br /> c) Findings. Based on the FEIR and the entire record before the City, <br /> the City Council finds that Mitigation Measure 15 -3 would reduce this impact to a less <br /> than significant level because it would require all tree removal or trimming and ground <br /> disturbing activities to be scheduled outside of the breeding season, or if that is not <br /> feasible, then the measure requires steps to be taken to avoid any significant impacts to <br /> nests based on consultation with the California Department of Fish and Game. <br /> Impact 15 -4: Potential Loss of Heritage Trees. Future development in <br /> accordance with the Draft DPP may result in the removal of heritage trees as <br /> defined by the City's Tree Preservation Ordinance (Municipal Code chapter 35). <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on page 15 -16 of the DEIR. <br /> b) Mitigation Measures. FEIR Mitigation Measure 15 -4 (p. 15 -16 of the <br /> DEIR) is hereby adopted and will be implemented as provided in the Mitigation <br /> Monitoring and Reporting Program. <br /> c) Findings. Based on the FEIR and the entire record before the City, <br /> the City Council finds that Mitigation Measure 15 -4 would reduce this impact to a less <br /> than significant level because it would require that any project in the DPP area that would <br /> involve the removal of any tree complete the application and review process specified in <br /> the City's Tree Preservation Ordinance (Municipal Code chapter 35) prior to project <br /> approval. <br /> 16 Geology and Soils <br /> Impact 16 -1: Expansive Soils Impacts. The proposed DPP would allow <br /> development in areas that may be subject to hazards from expansive soils. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on page 16 -6 of the DEIR. <br /> b) Mitigation Measures. FEIR Mitigation Measure 16 -1 (p. 16 -7 <br /> of the DEIR) is hereby adopted and will be implemented as provided in the Mitigation <br /> Monitoring and Reporting Program. <br /> c) Findings. Based on the FEIR and the entire record before the City, <br /> the City Council finds that Mitigation Measure 16 -1 would reduce expansive soil impacts <br /> to a less than significant level because it would: 1) require analysis of expansive soil <br /> hazards and full remediation of expansive soils, or site specific recommendations to fully <br /> mitigate the effects of weak or expansive soils, as reviewed by a City- retained registered <br /> geologist, that are to be submitted with the building permit application; and 2) require <br /> deed restrictions to prohibit significant modification of finished lot grades that would <br /> adversely affect site drainage. <br /> Impact 16 -2: Corrosive Soils Impacts. Development within the DPP area, in <br /> U: \Resolutions\2011\Reso 15086 Exhibit B.doc 46 <br /> 012011 Reso. # 15086 <br /> Muff #601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.