My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-02-07
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-02-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2011 1:19:07 PM
Creation date
2/3/2011 2:48:44 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
2/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1D <br /> Page 21 <br /> F. COST ESTIMATE <br /> We anticipate that the cost to complete the E1R will not exceed $84,140, as summarized below. This <br /> is a conservative estimate to accomplish the proposed scope of work. Our work will be billed on a <br /> time and materials basis, in accordance with the attached fee schedule and as outlined below. If we <br /> do not need all the time that has been budgeted, we will only charge you for the time that we have <br /> actually spent completing the work. <br /> This scope of work assumes that there will be no issues arising that would require any additional <br /> technical analysis or documentation. In the event that additional technical analysis is required, we <br /> could complete that work on a time and materials basis, upon your authorization. <br /> David J. Powers & Associates <br /> Preparation of all environmental documents and noticing $41,490 <br /> (NOP, NOC, NOA, NOD) $5,700 <br /> Meetings and hearings 547,190 <br /> Subtotal for DJP &A <br /> Subconsultants <br /> Carey & Co. (historic resources) $14,550 <br /> Illingworth & Rodkin (peer review, supplemental noise $4,830 <br /> analysis) <br /> Illingworth & Rodkin (air toxics analysis) $3,220 <br /> Hexagon (peer review of TIA) <br /> Cornerstone (peer review of geology and hazardous $2,300 <br /> materials reports) $2,530 <br /> Concentric Ecologies (peer review of arborist report) <br /> Subtotal for Subconsultants $1,130 <br /> $28,560 <br /> Printing <br /> Printing of all environmental documents and notices $4,500 <br /> Reimbursables <br /> (postage, mileage, shipping, NOD fees, CDFG fees, etc.) $3,890 <br /> GRAND TOTAL 584,140 <br /> 3 This cost assumes research and preparation of DPR forms for adjacent and nearby buildings as well as the project <br /> site. If no adjacent buildings need to be analyzed, the total budget for Carey & Co. would be reduced to $9,580 and <br /> the total project budget would be reduced to $79,170. ©N <br /> 0 n e <br /> � ®m <br />
The URL can be used to link to this page
Your browser does not support the video tag.