My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Flatley and Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Flatley and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2011 2:57:07 PM
Creation date
2/8/2011 2:57:05 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Flatley and Associates
PROJECT NAME
Proposal/Agreement for Professional Consulting Services Fire Station 9 Kitchen Improvements
RMP File Number
304.5
Date
2/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT ` <br /> F L A T L E Y A N D A S S O C I A T E S <br /> A. SCOPE OF WORK: <br /> Professional Services to Include but not limited to <br /> a) Preliminary Design: Provide preliminary design drawings for review by <br /> City and User. Adapt design as required following meeting. Assume (2) meetings <br /> to be attended by Joe Flatley (12 Hours x $120) <br /> b) Construction Documents: (20 Hours x $80 and 12 Hours x $120) <br /> c) Plumbing Consultant: Estimated $2000 (No Mark -Up) <br /> d) Agency Submittal: Review and respond to comments (4 Hours x $120) <br /> e) Bidding: Answer RFI's, prepare addenda, project manual, etc. (2 Hours x $120) <br /> f) Construction Administration: .Attend (4) on site construction meetings, <br /> answer RFI's, provide punch list, prepare close -out documents. (8 Hours) <br /> g) Items / Services Not Included in Proposal <br /> 1. Structural Engineering <br /> 2. Electrical Engineering <br /> 3. T24 Calculations <br /> AND CA 94606 ph. 408 . 466 . 3406 <br />
The URL can be used to link to this page
Your browser does not support the video tag.