Laserfiche WebLink
EXHIBIT ` <br /> F L A T L E Y A N D A S S O C I A T E S <br /> A. SCOPE OF WORK: <br /> Professional Services to Include but not limited to <br /> a) Preliminary Design: Provide preliminary design drawings for review by <br /> City and User. Adapt design as required following meeting. Assume (2) meetings <br /> to be attended by Joe Flatley (12 Hours x $120) <br /> b) Construction Documents: (20 Hours x $80 and 12 Hours x $120) <br /> c) Plumbing Consultant: Estimated $2000 (No Mark -Up) <br /> d) Agency Submittal: Review and respond to comments (4 Hours x $120) <br /> e) Bidding: Answer RFI's, prepare addenda, project manual, etc. (2 Hours x $120) <br /> f) Construction Administration: .Attend (4) on site construction meetings, <br /> answer RFI's, provide punch list, prepare close -out documents. (8 Hours) <br /> g) Items / Services Not Included in Proposal <br /> 1. Structural Engineering <br /> 2. Electrical Engineering <br /> 3. T24 Calculations <br /> AND CA 94606 ph. 408 . 466 . 3406 <br />