Laserfiche WebLink
__ DCB:rks 7/05/84 <br /> DCB:rks 7/20/84R <br /> DCB:rks 7/23/84R <br /> DCB:sah 7/24/84R <br /> <br />to Charley Brown's). The Project shall also <br />include necessary undergrounding of utilities and <br />any required acquisition of right-of-way or <br />relocation of facilities owned by P.G.& E. The <br />Project costs shall be all those costs <br />necessarily incidental to a public work <br />construction project, including, but not limited <br />to, engineering and design, contract <br />administration, actual construction and <br />inspection. <br /> <br /> The Project shall include all items listed <br />on Exhibit "A", attached hereto and incorporated <br />herein by this reference, but the actual cost of <br />these items, as listed in Exhibit "A", shall not <br />be reimbursed to Seaport. <br /> <br /> The Project shall not include the cost of <br />Traffic Signalization at the intersections of <br />Bloomquist Street and Seaport Court with Seaport <br />Boulevard, but shall include all costs of <br />underground preparation including conduit, <br />wiring, and related work for such traffic signal <br />and railroad crossing protection devices as <br />contained in those plans entitled "Reconstruction <br />of Seaport Boulevard Station 5 + 24.48 to Station <br /> <br /> <br />