Laserfiche WebLink
3.09 PARKING RESTRICTIONS <br /> A. General: The Contractor shall post approved "NO PARKING — CONSTRUCTION TOW -AWAY ZONE" <br /> signs at all locations necessary to establish work areas and detour traffic. <br /> B. Signs: <br /> 1. Signs shall read: "NO PARKING - CONSTRUCTION TOW -AWAY ZONE ". <br /> 2. Signs shall be placed at least 24 hours in advance of restriction. <br /> 3.10 BRIDGING OVER TRENCHES AND EXCAVATIONS <br /> A. General: Bridging shall be placed across all trenches and excavations in existing streets and at <br /> driveways when work is not in progress. Bridging shall be in accordance with the Standard Plans and <br /> Specifications and the CAMUTCD and approved by the City Engineer. <br /> B. De sign of Bridging_ <br /> 1. Bridging for vehicular traffic shall be of sufficient width to accommodate the required number of travel <br /> lanes. <br /> 2. Bridging shall be designed to support H -20 vehicular traffic. <br /> 3. All bridging shall be set flush with travel surface or a satisfactory transition from travel surface to top <br /> of bridging shall be provided. <br /> a. A satisfactory transition shall mean a change in elevation between the levels of not less than <br /> twelve (12) inches horizontal to one (1) inch vertical. <br /> b. Transition may be accomplished by means of temporary pavement. <br /> 3.11 TEMPORARY TRAFFIC LANES <br /> A. Temporary traffic lanes shall be at least 10 feet wide. Provide an additional 2 feet of clearance from <br /> curbs. The length of temporary lanes should be limited to the area under construction and the distance <br /> necessary to divert traffic in accordance with the Standard Plans and Specifications, the CAMUTCD, and <br /> the approved Traffic Control Plan. <br /> 3.12 STAGING AREAS <br /> A. The Contractor shall provide his own staging areas. <br /> * * <br /> TRAFFIC REGULATIONS 01550 -5 <br /> EMERGENCY VEHCILE PREEMPTION PROJECT 2010 <br />