My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Pacific Electric Contracting Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Pacific Electric Contracting Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2011 1:09:02 PM
Creation date
3/7/2011 1:08:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Electric Contracting Inc.
PROJECT NAME
Emergency Vehicle Preemption Project (2010) Jefferson Avenue-Marshall Street, Redwood City
RMP File Number
304.5
Date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. Contractor shall notify the City Engineer seven (7) days prior to intended date of initial turn on. City will <br /> arrange for presence of the Police Department at the time of initial turn -on. <br /> F. Turn -on procedures must be approved by the City Engineer. Contractor shall be responsible for all <br /> required traffic control measures required for the turn -on, to the satisfaction of the City Engineer. <br /> SIGNALS LIGHTING AND ELECTRICAL SYSTEMS 16500 -15 <br /> EMERGENCY VEHCILE PREEMPTION PROJECT 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.