Laserfiche WebLink
EXHIBIT --/\\■ <br /> 1659C Industrial Road <br /> San Carlos, CA 94070 <br /> E ; � ?- 811ment Inc <br /> � T 650.508.8018 <br /> www.greenenvironment.com F 650.508.8005 <br /> GREEN ENVIRONMENT INC. PROPOSAL <br /> GEI PROJECT #: R10683 <br /> Name: City of Redwood City <br /> Address: 1017 Middlefield Rd. Same On Broadway <br /> Redwood City, CA 94063 850 Jefferson Avenue <br /> Redwood City, CA <br /> Contact: Brian Lee, Senior Civil Engineer <br /> Phone: (650) 780 -7391 <br /> Cell: <br /> Fax: <br /> Email: blee @redwoodcity.org <br /> j ~ Proposal Date: 12/15/10 <br /> Sampling and reporting associated with NPDES permit for garage dewatering Prepared By: E. Ackerman <br /> system. <br /> Payment Terms: Net 30 <br /> Task 1: Monthly Monitoring and Quarterly Reporting $22,800 <br /> GEI will conduct monitoring of the treatment system from January 2011 through December 2011. GEI <br /> will collect groundwater samples for subsequent laboratory analyses as per the attached table. <br /> GEI will prepare a draft Quarterly Monitoring Report as per NPDES permit requirements, for the City's <br /> review, prior to report finalization and submittal to the RWQCB. The report will be uploaded to <br /> Geotracker in pdf format. GEI will provide a pdf version of each final report to the City. Each report will <br /> include a letter of transmittal, a compliance evaluation summary, a location map, the results of analyses <br /> and observations, data on flow and mass removed, and operational status. The fourth quarter report will <br /> be an Annual Report covering the previous calendar year. In addition to the quarterly report <br /> requirements, the annual report will contain a comprehensive discussion of the compliance record and <br /> any corrective actions necessary. To be billed monthly in equal increments of $1,900. <br /> Task 2: Additional sampling as required due to operational issues or as requested by the City or <br /> RWQCB. Changeout of particulate filters, attendance at meetings, or other tasks as requested by the $3,000 <br /> City or RWQCB. To be billed on a time and material basis as per the attached 2010 Schedule of <br /> Charges, with a Not-to-Exceed cost of $3,000 <br /> TOTAL LUMP SUM ❑ or ESTIMATED ► PRICE $25,800 <br /> Agreement: T e • • • r etween GEI and Customer will consist of this executed Proposal, and The G: • - - s and Conditions <br /> of the Agreement between GEI an • - - : • •• :r General Terms). The General Terms . 1• ' • = - ached and made part of this <br /> Proposal, are specifically made part of any agreemen s : - • 1 a • • - - . • er. <br /> Customer: / <br /> S nature Title Date <br />