My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 R.C.Peninsula Park, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 R.C.Peninsula Park, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2011 1:52:10 PM
Creation date
3/29/2011 1:50:24 PM
Metadata
Fields
Template:
Agreement
Contractor Name
R.C.Peninsula Park, LLC
PROJECT NAME
Community Facilities District No. 2010-1
RMP File Number
(One Marina)
Date
3/28/2011
Reso Ref
15104
Amendment
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> EXHIBIT A <br /> CITY OF REDWOOD CITY <br /> COMMUNITY FACILITIES DISTRICT NO. 2010-1 <br /> (ONE MARINA) <br /> DESCRIPTION OF FACILITIES ELIGIBLE TO BE FUNDED BY THE DISTRICT <br /> FACILITIES <br /> It is intended that the District will be authorized to finance all or a portion of the costs of <br /> any of the following improvements to be owned by the District: <br /> 1. Facilities: <br /> a. Any and all District costs, including payment of equivalent dwelling unit (EDU) <br /> fees, associated with the construction of or District financial contribution to any <br /> "All Zones, Zone A, Zone B, Zone C, or Zone D East 101 Public Infrastructure <br /> Requirements as set forth in Exhibit D to the Development Agreement, as it may <br /> be amended from time to time, including, but not limited to: <br /> • The Bloomquist Bridge Extension; <br /> • The Highway 101 pedestrian undercrossing; <br /> • All grading, temporary access roads, erosion control, sanitary sewer, potable <br /> water, storm sewer, reclaimed water, natural gas line; communication lines; <br /> electrical facilities; street lights; pedestrian lights; pedestrian walkways; <br /> landscape; signage; paving; curb and gutter; striping; erosion control; or other <br /> improvements necessary to construct or reconstruct Bair Island Road <br /> including all planning, design, construction supervision; geotechnical; survey <br /> and overhead design review and inspection fees necessary to complete same; <br /> • East Bayshore Road Pavement; <br /> • New potable water lines under Highway 101; <br /> • Regional water storage tank including land acquisition; <br /> • Sanitary sewer pump station; <br /> • Storm sewer pump station; and <br /> • Any planning, design review fees, permit, inspection, construction <br /> observation, overhead, as built drawings; and other third party costs to include <br /> entities controlled by a public utilities commission and the like associated <br /> with the construction and completion of the facilities; <br /> b. Any and all facilities to be located within the public utility or street easements, <br /> which easements are dedicated to the City or for the benefit of the "public," or <br /> flood control improvements, to include but not be limited to: <br /> • Fill and bank improvements; <br /> • On site parks and appurtenances; <br /> A -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.