My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 RMC Water and Environment
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 RMC Water and Environment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2011 4:53:22 PM
Creation date
4/6/2011 4:53:20 PM
Metadata
Fields
Template:
Agreement
Contractor Name
RMC Water and Environment
PROJECT NAME
Local Drainage System Improvements and 5th Avenue Pump Station Renovation Project
RMP File Number
304.5
Date
4/6/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City ofRedwood City <br /> Proposal to Prepare Proposition YE SWFM Grant Application and Bay Area IRWMP Project Template <br /> 2. PROPOSED TEAM <br /> RMC has put together a team with proven success in preparing and managing complicated <br /> grant applications such as the Prop. 1E SWFM application. Below is a brief summary of the <br /> RMC team members. <br /> Tish Berge (RMC) - Project Manager <br /> Tish Berge will serve as the Project Manager for the Project, responsible for the day -to -day <br /> execution of the grant application and preparing the economic analysis. Tish is a water and <br /> wastewater project manager with experience in team -based planning and capital projects and <br /> presenting technical information and recommendations to decision makers and industry <br /> groups. In addition to her consulting engineering experience, Tish has worked In the public <br /> sector as assistant general manager for the award winning San EIiJo Joint Powers Authority <br /> where she provided direction to operations, maintenance, and laboratory staff; developed and <br /> managed master planning efforts; and developed an intensive ocean monitoring program. Tish <br /> also directed the environmental compliance department at the Encina Wastewater Authority <br /> and managed environmental and regulatory analysis projects as an engineering consultant. <br /> Tish has also played a vital role in preparing the economic analysis for Water Supply Costs and <br /> Benefits, Water Quality and Other Expected Benefits, and Economic Analysis for Flood Damage <br /> Reduction for the following funding pursuits: <br /> • San Diego IRWMP Proposition 84 (round 1) <br /> • Coachella Valley IRWMP Proposition 84 (round 1) <br /> • Greater Los Angeles IRWMP Proposition 84 (round 1) <br /> Grizelda Soto (RMC) - Project Planner <br /> Grizelda Soto will serve as the project planner and primary resource for the team. Grizelda has <br /> a background in environmental science, with a water resources management focus. She is <br /> experienced In water resources planning, grant writing, water restoration field work, and water <br /> quality evaluations. Grizelda's modeling experience includes use of WARMF, HEC -RAS, and GIS. <br /> Grizelda has played key roles In a number of funding pursuits including: <br /> • Coachella Valley IRWMP application (DWR) <br /> • Greater Los Angeles County IRWMP Proposition 84 application (DWR) <br /> Joanne Siew (RMC) - Environmental Scientist <br /> Joanne Slew will serve as our teams QA/QC assuring the grant application is consistent with the <br /> Bay Area IRWM Plan. Joanne specializes in environmental science and management with an <br /> emphasis in water resources management. She has worked on multi - disciplinary projects <br /> involving hydrologic modeling and analysis, and watershed planning and policy. In addition, <br /> Joanne is versed in CEQA legislation and has prepared CEQA documents. Joanne's technical <br /> 13 Rage <br /> RMC Water and Environment <br />
The URL can be used to link to this page
Your browser does not support the video tag.