My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-07-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:39:36 PM
Creation date
7/10/2003 4:24:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Interview
Agency Type
City Council
Date
7/14/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r7 .;- 12 <br />MARK THOMAS & COMPANY, INC. <br />Providing Engineering, Surveying and Planning Services <br />June 5, 2003 <br />Mr. Peter Vorametsanti <br />Senior Civil Engineer <br />City of Redwood City <br />10176 1h Middlefield Road <br />Redwood City, CA 94064 <br />RE: Route 101 /Ralston Ave IC Modifications <br />EXTRA WORK REQUEST - EXHIBIT A <br />503 Seaport Court, Suite 105 <br />Redwood City, CA 94063 <br />PHONE (650) 363 -8277 <br />FAX (650) 363 -8279 <br />File No. 51- 99001(B) <br />As requested by the City of Redwood City, we are submitting our proposal for the <br />following additional scope of work. Our estimated level of effort for this work is <br />included as Attachment B. <br />1. Island Parkwav Slab Bridee Alternative <br />MTCo will revise existing plans to allow contractors to bid a portion of Island Parkway <br />as a reinforced concrete slab bridge as an alternative to embankment construction with <br />MSE walls. The slab bridge will extend from approximately Station IP 71 +00 to 72 +25, <br />and will be entirely within City right of way to avoid Caltrans formal review process. <br />The 100% bridge plans and special provisions will be included with the bid documents. <br />The bid schedule will be revised to allow the contractors to bid the Island Parkway slab <br />bridge as an alternative. <br />The roadway plans will not be revised until after the city has determined which <br />alternative is selected. If the slab bridge alternative is selected, the Layout, Construction <br />Details, Drainage, Retaining Wall and Erosion Control plans will be revised accordingly. <br />It is not anticipated that the Stage Construction/Traffic Handling Plans would need to be <br />revised as the construction sequence should be the same for the slab bridge as the <br />embankment construction. <br />2. Preaare Sunnlemental Geotechnical Report <br />A foundation report for the Island Parkway slab bridge will be prepared by our <br />geotechnical subconsultant, Parikh Consultants, Inc as a supplement to the final <br />Geotechnical Design and Materials Report for the Route 101/Ralston Interchange <br />Modifications project. Included in this task are two cone penetrometer tests that are <br />required for the foundation analysis. It is anticipated that the testing can be done without <br />requiring temporary lane or shoulder closures, therefore we have not included a budget <br />for traffic control. <br />EXHIBIT <br />CUPERTINO PLEASANTON REDWOOD CITY SACRAMENTO SAUNAS SAN JOSE WALNUT CREEK <br />
The URL can be used to link to this page
Your browser does not support the video tag.