Laserfiche WebLink
J copy, <br /> , <br /> A <br /> CONSTRUCTION PERMIT <br /> 1101111110011 ENGINEERING & CONSTRUCTION L <br /> U� iIllin'uhf CITY OF REDWOOD CITY, CALIFORNIA <br /> U <br /> leediglee www.redwoodcity.org <br /> WY / PERMIT NO. CP09 -0016 , T! <br /> Pursuant to the provisions of Article VII, Chapter 29, of the Code of the City of Redwood City, a <br /> permit is hereby granted to Granite Construction Company of Watsonville , CA., <br /> hereinafter called Permittee, for the purpose of performing improvements to wit: Caltrain- <br /> SMCO Grade Crossing Impvt. #09- PCJPB -C -025 , in the City of Redwood City, County of <br /> San Mateo. <br /> This permit is granted subject to the following conditions: <br /> (1) The permittee pays the amount of $ 3000 in account 681323 to cover the <br /> cost of plan checking and inspection of the proposed improvements. <br /> (2) The permittee shall deposit with the City Engineer a check, Certificate of Deposit, <br /> or a faithful performance bond and payment bond, both in the amount of $ n/a ; and shows <br /> proof of insurance referred to in the application for the permit. <br /> (3) Reference is hereby made to the attached application for permit executed by <br /> Permittee under date of 4/1 /2009 and the same is hereby incorporated herein and made a <br /> part hereof as set forth herein verbatim. <br /> (4) Permittee assumes all responsibility for safety on the project, and shall erect <br /> barriers or waming devices as required. <br /> (5) All work to be done by Permittee shall be performed in accordance with and <br /> subject to all terms and conditions of the attached specifications and plans, and to the <br /> "Engineering Standards" approved by the City Engineer and by reference incorporated herein <br /> and made a part hereof. <br /> (6) Permittee is responsible to make arrangements with the design engineer for the <br /> preparation of the "as- built' plans. The engineer shall perform limited field work only to verify <br /> that the "as- built" drawings are in substantial compliance with the field conditions. The "as- built" <br /> plans shall be the original tracings or permanent mylar, good quality, showing the engineer's <br /> certificate as stated above. <br /> (7) The grant of this permit shall be voided at the City Engineer's option for any <br /> violation of City ordinances, and is good for a period of one year from the date of issue. <br /> (8) Conform to Construction Best Management Practices (BMP), as detailed in the <br /> Attached Booklet entitled "Blueprint for A Clean Bay". <br /> (9) Other: —At least 24 hours prior to inspection contact city inspector Peter Delgado <br /> at 650- 740 -7373. <br /> GRANTED: CITY ENGINEER <br /> CITY OF REDWOOD CITY <br /> Date: �' l t 09 <br />