My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-05-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2013 11:02:31 AM
Creation date
5/19/2011 4:36:18 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
5/23/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 4 <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> 2011-2012 UTILITY TRENCH Repair Project <br /> THIS AGREEMENT, made this day of , 201 , by and between BAY <br /> AREA PAVI NG, I NC. whose place of business is at P.O. BOX 6339 SAN MATEO, CA 94403 <br /> hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and municipal <br /> corporation of the State of California, hereinafter referred to as "CITY". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br /> as follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of$231,770.00, computed <br /> in accordance with Contractor's Accepted Proposal dated, MAY 4, 2011, which <br /> Proposal is incorporated herein by reference thereto as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within 365 <br /> Calendar Days from the date the Contract Time commences to run. <br /> C:\Program Files\Neevia.Com\Document Converter\temp\3678.docUtility Trench Repair 2011-2012 <br /> 5/19/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.