My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-08-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:30:16 PM
Creation date
8/7/2003 2:39:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
8/11/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
y, p- b <br />Culvert $ 3,800,000 <br />Estimated cost to relocate the culvert so the underground public parking structure can be <br />built. <br />&reetscape Improvements $ 1,675,000 <br />Estimated cost to construct improvements for 'Theater Way" between Broadway and <br />Winslow, and modifications to Broadway for proposed protected drop -off for Cinema and Fox <br />Theater. This concept was approved by the City Council /Agency Board in the Joint Study <br />Session in March, 2003. <br />Courthouse Plaza $ 6,483,190 <br />Estimated hard and soft costs associated with the demolition of the Annex on Broadway, the <br />restoration of the fagade of the Courthouse, and the construction of the proposed new plaza. <br />Miscellaneous Downtown Projects $ 650,000 <br />Estimated costs to Theater Way 2 (Middlefield between Broadway and Veteran's Blvd); <br />gateway improvements and directional signage for downtown; enhanced public open spaces; <br />Winslow realignment; and improvements to redirect traffic back unto Broadway. These <br />improvements help implement the Downtown Plan and reflect direction received in the Joint <br />Study Sessions with the Council /Agency Board, Planning Commission and the Architectural <br />Review Committee. Money originally budgeted to fund a fountain in the plaza between City <br />Hall and City Center Plaza will be redirected to this project. <br />Development Incentives /Contingency $ 3,067,000 <br />Estimated costs for offsite reimbursements for the Franklin Street Apartments; downtown <br />precise plan; possible incentives for private development projects; and contingency for <br />unforeseen opportunities and expenses. <br />These projects total almost $37M. The plan for funding these projects includes $1.5M in <br />existing Agency resources, approximately $31 M in Agency bonds, and an estimated $4.5M in <br />a loan from the City. This funding plan is detailed below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.