Laserfiche WebLink
<br />Redwood City Courthouse Plaza, Pavilions & Falfade Lighting <br /> <br />11 March 2005 <br /> <br />Page 5of6 <br /> <br />r. Editing of AutoCAD files after the completion of Phase II (Contract Documents). <br /> <br />s. Design and specification of lighting for video conferencing and/or televised broadcast. <br /> <br />t. Final lamp schedule and/or Operations Manual for the Building Maintenance Crew. <br /> <br />u. Other services not specifically identified under Scope of Services. <br /> <br />General <br /> <br />a. When maximum electrical lighting loads permitted by code are determined by others, the Lighting Designer will not commence <br />any layouts until written information is received defining these loads or be responsible for any delays resulting therein, nor will <br />the Lighting Designer be responsible for or assume the cost of any re-design resulting from error in such calculations <br />performed by others. <br /> <br />b. The Lighting Designer will design to the best of his ability according to building codes but will be dependent upon the licensed <br />professionals (Architect or Engineer) for notification of non-compliance prior to approval of lighting fixture submittals and will <br />not be solely responsible for problems which arise during construction due to non-compliance with codes. <br /> <br />c. The Lighting Designer will not be responsible for design of emergency or exit lighting systems or for designation of fixtures for <br />emergency or exit lighting systems. <br /> <br />d. The Lighting Designer will not be responsible for any changes in his final drawings and specifications unless approved by the <br />Lighting Designer. Changes include, but are not limited to, substitutions of and/or by manufacturers, variations in layouts, <br />quality and quantity of fixtures, etc. <br /> <br />e. The Lighting Designer will not be responsible for any errors, equipment failures or delays caused by manufacturers, <br />contractors, shippers, installers or users; nor is the Lighting Designer responsible for a contractor's failure to carry out the <br />construction in a workmanlike manner or in accordance with contract documents or recommendations. <br /> <br />f. The Architect shall provide the Lighting Designer, in writing, with information about any existing conditions, which could affect <br />fixture selection and/or location, prior to issuance of Lighting Designer's design development drawings. If this information is not <br />provided, the Lighting Designer will assume that no restrictions exist and will proceed accordingly. If conditions are found <br />during construction that necessitate changes, additional services will have to be authorized by the Landscape Architect for the <br />Lighting Designer to make these changes. <br /> <br />. <br />g. The Architect shall provide the Lighting Designer, in writing, with information about the required lighting budget. If this <br />information is not provided, it is assumed that the final budget reviewed and approved in Design Development is the agreed <br />upon lighting budget. If the lighting must be redesigned due to changes in the agreed upon lighting budget or for other overall <br />project budget reasons, this redesign work will be considered an extra service. <br /> <br />h. This Proposal will remain valid for sixty (60) days after the date it is written. If the accepted Proposal has not been received in <br />the Lighting Designer's office by the end of this period, its terms and conditions will be open for further negotiations. <br /> <br />i. It is assumed that the Lighting Designer's work will be completed according to a mutually agreed upon schedule. If consulting <br />work on the project continues beyond this schedule, this agreement will be open for further negotiations. <br /> <br />j. This agreement is subject to cancellation by either party at any time upon ten days written notice. In the event of cancellation, <br />all accrued charges become due for work completed to that point. <br /> <br />SF lLA I NY 1300 Brannan Street Suite 212 San Francisco CA 94107 415 348 8273 voice 415 348 8298 fax I www.HLBLighting.com <br />