Laserfiche WebLink
FA -3i <br />• Noise Mitigation Measure 1 of the 1989 Proposed Second <br />Amendment to the City of Redwood City Redevelopment Plan for <br />Redevelopment Project #2 Draft EIR <br />Finding: The mitigation measure is feasible and would redu -e the <br />impacts of the Project and the Higher Occupancy Scenario to less- than - significant <br />levels. <br />The mitigation measure would reduce the potential impact on air quality by <br />minimizing the amount of exposed soil and dust and by maintaining equipment engines <br />in good condition. The mitigation measure would reduce the potential impact on noise <br />by reducing engine noise and by limiting construction activities to times of day when <br />receptors are less sensitive. <br />H. Drainage Facilities <br />Potential Impact: If improvement to the drainage system is necessary <br />under the proposed project, the following construction impacts could result: traffic could <br />be inconvenienced and require detours; air quality standards could be exceeded if bare <br />soil was left exposed and construction vehicles were in operation; and community noise <br />standards may be exceeded during operation of construction vehicles and equipment. <br />Mitigation: The following mitigation measure, as set forth in the Initial <br />Study and the FEIR, is hereby adopted and will be implemented as provided in the <br />Mitigation Monitoring Program: <br />The project sponsor would be responsible for the following mitigation <br />measures to reduce the severity of the construction impacts related to drainage <br />improvements to less than significant: <br />• The storm drainage improvement projects proposed under the <br />Second Amendment to the City of Redwood City Redevelopment <br />Plan for Redevelopment Project #2 should be designed and <br />constructed to meet all criteria and standards established by the <br />Redwood City Community Development Department. <br />• Air Quality Mitigation Measures 1 to 5 of the 1989 Proposed <br />Second Amendment to the City of Redwood City Redevelopment <br />Plan for Redevelopment Project #2 Draft EIR <br />• Noise Mitigation Measure 1 of the 1989 Proposed Second <br />Amendment to the City of Redwood City Redevelopment Plan for <br />Redevelopment Project #2 Draft EIR <br />• No schedule for implementation of new storm water drainage <br />facilities proposed for the Redevelopment Project #2 Area has been <br />adopted. It is expected that those improvements will occur <br />20 <br />