My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-08-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:26:21 PM
Creation date
8/21/2003 3:19:16 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
8/25/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�') a- I <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manaqer <br />August 25, 2003 <br />Subject <br />Award of Contract — Redwood City Police Department Lobby Remodel Project <br />Recommendation <br />Approve the Contract Documents and award the contract for the Redwood City Police <br />Department Lobby Remodel Project to the lowest responsible bidder, Coast Side <br />Associates of Half Moon Bay, California, for their low bid of $58,100, and reject all <br />other bids. <br />Background <br />The Redwood City Police Department's front counter desk and lobby area was initially <br />designed and constructed for a single receptionist. In order to provide a higher level of <br />customer service, the lobby area will be renovated, and a new counter (meeting ADA <br />— height requirements, and providing additional work area) will be provided. — <br />Five (5) bids for the above - referenced project were received on August 6, 2003, and are <br />summarized below. <br />Rank <br />Contractor <br />Amount <br />(Base Bid) <br />$58,100.00 <br />$59,147.00 <br />$74,000.00 <br />$80,631.00 <br />$92,200.00 <br />1. Coast Side Associates — Half Moon Bay, CA <br />2. Tinney Construction, Corp. — Redwood City, CA <br />3. Hipsher Construction — San Carlos, CA <br />4. Lyncon Construction, Inc. — San Jose, CA <br />5. Bridqer Construction Co. — Redwood City, CA <br />The Engineer's Estimate for Base Bid is $39,750. <br />The low bid of $58,100.00 was 46% above the Engineer's Estimate of $39,750. After <br />reviewing the Engineer's Estimate, it became apparent that the anticipated cost of the <br />required "Finishes" had been inadvertently omitted, and that cost was approximately <br />$8,000. Furthermore, the cost of the benches was $8,400, not $3,400. These <br />additional costs would have brought the Engineer's Estimate from $39,750 to $56,150. <br />Based on the aforesaid, the bid is considered a fair and responsive bid. <br />A complete copy of the agreement is available for review in the City Clerk's Office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.