My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Mark Thomas
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Mark Thomas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2009 10:59:37 AM
Creation date
8/25/2003 10:46:47 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Co.
PROJECT NAME
Ralston Ave Marine Parkway Rt 101 interchange
RMP File Number
304
Date
7/30/2003
MO Ref
03-152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> I <br /> EXHIBIT A <br />We understand the scope of work to be the following: <br />1. Review and modify the Contract Plans (bid set) to incorporate the Island Parkway slab <br /> bridge option in place of the MSE wall design, and incorporate Addenda No.1, No.2 & <br /> No.3, and Bid Clarifications into the plans. <br />2. Incorporate Caltrans Traffic Unit comments sent after project was advertised (Revision 1). <br />3. Only Item 2 changes will be "bubbled" on plans and identified as to source of change by <br /> number in a Revision Block added to the plan sheet. All changes under Item 1 will be <br /> made without any special indicator or "bubble," except that each sheet that has been <br /> modified will be marked "CONFORMED PLAN" in bold print on the right side of the <br /> plan sheet. <br />4. Special Provisions will not be changed except that Addenda will be inserted in beginning <br /> by Peninsula Digital for printing construction copies. <br />5. Provide revised Plot Files (full and half size) for all changed sheets to Peninsula Digital <br /> for production of Construction Conform plan sets. <br />The following table gives approximate number of plan sheets to be changed (based on <br />preliminary review of plans - actual number will determined during revisions): <br /> Plan Sheet Tvpe Estimated Number of Sheets <br /> Title Sheet 1 <br /> Typical Cross Sections 6 <br /> Layout & Profiles 3 <br /> Construction Details - Grades 7 <br /> Construction Details - ADL 5 <br /> Construction Details - Details 10 <br /> Contour Grading 1 <br /> Drainage 4 <br /> Sanitary Sewer Plans 3 <br /> Water Main Plan 4 <br /> Utility Plan 3 <br /> Stage Construction! TH Plans 4 + 11 Caltrans <br /> Pavement Delineation o + 12 Caltrans <br /> Quantities 7 <br /> Sign Plans 2 + 3 Caltrans <br /> Retaining Wall Plans 16 <br /> Log of Test Boring 4 <br /> Structure Plans 17 <br /> TOTAL SHEETS 123 <br /> Exhibit A - Route 101/ Ralston Avenue Interchange - Slab Bridge <br />., , ,... . '1'" h_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.