My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Mark Thomas
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Mark Thomas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2009 10:59:37 AM
Creation date
8/25/2003 10:46:47 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Co.
PROJECT NAME
Ralston Ave Marine Parkway Rt 101 interchange
RMP File Number
304
Date
7/30/2003
MO Ref
03-152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Prepared by: Mark Thomas & Company <br />Dated: March 22, 2004 <br /> <br />SC,)PE OF SERVICES <br />CITY OF REDWOOD CITY <br /> <br />DESIGN SERVICES FOR ONE BRIDGE DESIGN OPTION <br />FOR ISLAND P ARKW A Y <br /> <br />The project is to combine the current two bridges as one structure. The structure will be a slab <br />bridge, supported on a standard 14" piles (if feasible). <br /> <br />1) Provide management services during the redesign of Island Parkway Bridge, including <br />coordination with Caltrans Structures to secure design approval, meet with RE to <br />determine utility relocation issues, and provide City with project schedule and status <br />report. <br /> <br />2) Update 14 sheets of bridge plans and perform structural design analysis and calculations. <br /> <br />3) Prepare quantities and update SSP for structures as required. <br /> <br />4) Prepare a short letter report that will include the pile data table, the analysis results. <br />Perform L-pile analysis for a 14" pile, include the LOTB for the bridges for Caltrans <br />review etc. This work will be performed by Parikh Consultants. <br /> <br />5) Perform independent bridge check. <br /> <br />6) Submit 100% design PS&E to Caltrans Structure for review. <br /> <br />7) Review Caltrans' comments and incorporate Caltrans' comments. <br /> <br />8) Submit Final Approved sets of bridge plans and specification for construction purposes. <br /> <br />Mark Thomas & Company will perform above scope of services for not to exceed $48,000 as <br />follows: <br /> <br />Structures Manager <br />Engineer VII <br />Engineer V <br />Engineer ill <br />Reimbursable Expenses <br />Parikh Consultants <br /> <br />74 hrs @ $166.001hr <br />132 hrs @ $110.001hr <br />110 hrs @ $88.001hr <br />80 hrs @ $74.00/hr <br /> <br />12,284 <br />14,520 <br />9,680 <br />5,920 <br />796 <br />4,800 <br /> <br />Total Estimated Charge <br /> <br />$48,000 <br /> <br />EXHIBIT .L <br />
The URL can be used to link to this page
Your browser does not support the video tag.