My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:21:53 PM
Creation date
9/4/2003 3:46:36 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/8/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jr- <br />r Table Etzi: Recommended ft4aet (aternrrtlw n) Capital Coat &Unary <br />Item Descdetlon Ceet <br />1 Storage and starWbv Potahte Connections ( S 5,704 <br />2 Pumokg S ,„320 <br />3 Transmission Pbeline S 15248.000 <br />v 4 1 SDedel CronkW by Jack and Bore I S - <br />5 1 fneahnent Facilitiaa I S 1 <br />Subtota► Fad ides 1 S z8.906.000 <br />I 6 ( Servles Connections and Ratrolit (10% or ized as Cost) $ 2.391,OD0 <br />I Subtotal FadlWes & Connecdom I S 28.M.000 <br />I Enolnewho. CM, and Administration (20%1 1 1 5 ` 280.000 <br />ConlMparwv (20%) S 5260.000 <br />TOTAL. $ 38.819.000 <br />6- <br />ES.5 Implementation Strategy <br />The basic implementation strategy for Altemadve D water supply and capital Improvement <br />program Is summarized In Table ES-2. The' .'e . , V". n concept is to simultaneously build <br />backbone inrrastrucWre facilities such as treatment, pumping, storage and transmission <br />pipelines, while aggressively preparing In detail for customer connecrlom and site retrofit <br />Based on the experiences of other Bay area projects, customer coordination and site retrofit <br />requirements are typically underestimated, and actual recycled water use has fallen short of <br />original projections. <br />The proposed project could be implemented In multiple phases. Treatment storage, pumping, <br />and pipeline transmission faclities to serve the Redwood Shores Area could be constructed in <br />fiscal year (FY) 2003/ 2004, and customer services and site retrot'ds could be constructed over a <br />three -year period between 2003 and 2006. so full supply bene0ts are obtained during the 2007 <br />irrigation season. The Greater Bayhont Area project phase may be driven by hrbure developer <br />schedules, but it is tentatively planned that the 5-aft transmission Una from SBSA to the <br />Whipple Avenue/Highway 101 interchange could be in piece by the year 20MAvhtie the entire <br />Greater Bayrront Area could be served by 2009. In this scenario, the entire Alternative D project <br />could be in place by 2009, which may be advantageous to the City as the Master Sales <br />Agreement between San Francisco and suburban purchasers will be renegotiated in 2009/2010 <br />(contract expiration). <br />I <br />I <br />F <br />P, <br />f <br />t <br />r <br />f <br />— I Water Recyr*ig FeasWily Study for Redwood City rm <br />
The URL can be used to link to this page
Your browser does not support the video tag.