My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Republic Electric
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Republic Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2005 12:10:03 PM
Creation date
9/5/2003 12:20:38 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Republic Electric
PROJECT NAME
2000-01emergency electrical repair
RMP File Number
304
Date
6/14/2000
Reso Ref
13954
MO Ref
01-33
Box
6039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORIGINAL <br /> <br /> DES:djk 11/07/00 <br />F: Shared/Redwood/Council/Agmt-370 <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "City", and REPUBLIC ELECTRIC of Novato, California, <br />hereinafter referred to as "Contractor", for the consideration hereinafter stated, hereby agree as <br />follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish all <br /> of the labor, equipment, materials, and tools to perform within Five (5) calendar days after <br /> the NOTICE TO PROCEED FOR EACH SERVICE REQUESTED, the following work: <br /> <br />2000-2001 EMERGENCY ELECTRICAL REPAIRS SERVICE <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the City Engineer of Redwood City, which Documents are <br />incorporated herein and made a part of this Agreement as if herein fully set forth. <br /> <br />City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Seventeen Thousand Five Hundred <br />Ninety-four and No/100 Dollars ($17,594.00) computed in accordance with Contractor's <br />accepted Proposal dated June 13, 2000, which accepted Proposal is incorporated herein by <br />reference thereto as if herein fully set forth. <br /> <br />All of the work to be done shall be done under the direction and supervision of, and to the <br />approval of, City or its authorized representative, and the work shall be done in the best <br />workmanlike manner, conforming strictly to the provisions of the specifications and plans <br />made thereof. <br /> <br />(a) <br /> <br />Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor shall, as <br />a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker <br />employed in the execution of the Contract by Contractor or by any subcontractor for <br />each calendar day during which such worker is required or permitted to work more than <br />8 hours in any one calendar day and 40 hours in any one calendar week, unless such <br />worker receives compensation for ali hours Worked in excess of eight (8) hours at not <br />less than 1-1/2 times the basic rate of pay. <br /> <br />(b) <br /> <br />Pursuant to the provision of California Labor Code, Sections 1770 et seq. Contractor <br />and any subcontractor under him shall pay not less than the prevailing rate of per diem <br />wages as determined by the Director of the California Department of Industrial <br />Relations. Pursuant to the provisions of California Labor Code Section 1773.2, <br />Contractor is hereby advised that copies of the prevailing rate of per diem wages and a <br />general prevailing rate for holidays, Saturdays and Sundays and overtime work in the <br />locality in which the work is to be performed for each craft, classification, or type of <br />worker required to execute the Contract, are on file in the office of the City Clerk, <br />which copies shall be made available to any interested party on request. Contractor <br />shall post a copy of said prevailing rate of per diem wages at each job site. <br /> <br />(c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay <br /> travel and subsistence payments to each worker needed to execute the work, as such <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.