My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Shea Homes
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Shea Homes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2016 9:43:00 AM
Creation date
9/8/2003 1:16:13 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Shea Homes Limited Partnership
PROJECT NAME
DDA - Disposition and Development Franklin Street Project
RMP File Number
100
Date
10/28/1999
Reso Ref
RD-99-31
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Brian Kangas Foulk <br /> <br />Description of Shea Shared Infrastructure <br /> <br />Shea Ho.*e~ Phr~ve -Stand Alone <br /> <br />I. Franklin Street <br /> <br />· Replace and narrov,, Franklin ,S+re~*-tztv::::-~:iaP,~.oe ~ ...... ,-~ .....e .... <br />· Provide interim transition to the existing roadway southeast of the Monroe Street <br /> intersection. .-, <br />· Restripe the pedestrian crossing at lhe intersection of Franklin Street and Jefferson Street. <br /> <br />II. El Camino Real <br /> <br />Install frontage improvements on El Camino between the existing Bekins building and <br />Jefferson Street. <br />Construct new curb cuts at the new private streets (Madison and Jackson). Provide <br />medians to allow right turn in and out of Madison, while continuing to allow and <br />accommodate left turns from El Camino onto the south leg of Madison Street and From <br />south Madison Street onto El Camino. <br /> <br />[II. ,Nlonroe Street <br /> <br />· Reconstruct Morgoe Street between Franklin Street and the CalTrain right of way. <br />· Provide fire truck turnaround at the end of Monroe Street. <br /> <br />IV. Public Undereround Utilities <br /> <br />A. Storm Drainage. <br /> <br /> · Install trunk, line from the Redwood Creek outfall near Maple Street to Franklin <br /> Street. <br /> · Size the line to anticipate future development. <br /> · Continue the trunk line in Franklin Street, Madison Street and Jackson Street. <br /> Accommodate and connect off-site piping at Madison Street. <br /> · Construct a second trunk line in Franklin Street and Wilson Street to discharge into <br /> the existing box culvert at CalTrain right-of-way. Accommodate and connect off-site <br /> piping at Jefferson Street. <br /> <br />540 Price Avenue ,, Reclwo~ City, CA 940E3 ,, {650) 482:'6'J00 * FAX (6501482-6399 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.