My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Bay Area Paving
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Bay Area Paving
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:56:33 PM
Creation date
9/11/2003 9:39:12 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Paving
PROJECT NAME
utility trench repair svc. 03-04
RMP File Number
304
Date
9/2/2003
MO Ref
03-176
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(c) As required by Section 1773.8 of the California Labor Code, Contractor shall <br /> pay travel and subsistence payments to each worker needed to execute the <br /> work, as such travel and subsistence payments are defined in the applicable <br /> collective bargaining agreements filed in accordance with this Section. <br /> <br />(d) To establish such travel and subsistence payments, the representative of any <br /> craft, classification, or type of workman needed to execute the contracts shall <br /> file with the Department of Industrial Relations fully executed copies of <br /> collective bargaining agreements for the particular craft, classification or type of <br /> work involved. Such agreements shall be filed within 10 days after their <br /> execution and thereafter shall establish such travel and subsistence payments <br /> whenever filed 30 days prior to the call for bids. <br /> <br />(e) Contractor shall comply with the provisions of Section 1775 of the California <br /> Labor Code and shall, as a penalty to City, forfeit Twenty Five and No/100 <br /> Dollars ($25.00) for each calendar day, or portion thereof, for each worker paid <br /> less than the prevailing rate of per diem wages for each craft, classification, or <br /> type of worker needed to execute the Contract. <br /> <br />(f) As required under the provisions of Section 1776 of the California Labor Code, <br /> Contractor and each subcontractor shall keep an accurate payroll record, <br /> showing the name, address, social secudty number, work classification, <br /> straight time and overtime hours worked each day and week, and the actual <br /> per diem wages paid to each journeyman, apprentice, worker, or other <br /> employees employed by him or her in connection with the public work. Said <br /> payroll shall be certified and shall be available for inspection at all reasonable <br /> hours at the principal office of Contractor on the following basis: <br /> <br /> (1) A certified copy of an employee's payroll record shall be made available for <br /> inspection or furnished to the employee or his or her authorized <br /> representative on request. <br /> <br /> (2) A certified copy of all payroll records enumerated in Paragraph 4(f~, herein, <br /> shall be made available for inspection or furnished upon request to the City, <br /> the Division of Labor Standards Enforcement, and the Division of <br /> Apprenticeship Standards of the Department of Industrial Relations. <br /> <br /> (3) A certified copy of all payroll records enumerated in Paragraph 4(f), herein, <br /> shall be made available upon request by the public for inspection or copies <br /> thereof made; provided, however, that a request by the public shall be <br /> made through either the City, the Division of Apprenticeship Standards or <br /> the Division of Labor Standards Enforcement. If the requested payroll <br /> records have not been provided pursuant to Subparagraph 4(f)(2) herein, <br /> the requesting party shall, prior to being provided the records, reimburse <br /> the costs of preparation by Contractor, subcontractors, and the entity <br /> through which the request was made. The public shall not be given access <br /> to the records at the principal offices of the Contractor. <br /> <br /> Contractor and each subcontractor shall file a certified copy of the <br /> records, enumerated in Paragraph 4(f) with the entity that requested the <br /> records within 10 days after receipt of a written request. Any copy of <br /> records made available for inspection and copies furnished upon request <br /> to the public or City, the Division of Apprenticeship Standards, or the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.