Laserfiche WebLink
CAMP DRESSER & MCKEE INC. <br /> <br /> EXHIBIT "B" <br /> <br /> TEMPORARY PUMP STATION INSTALLATION COST BREAKDOWN <br /> <br />Construction Amount <br />Field Labor and Supervision $5,860.00 <br /> <br />Materials (sand bags, pipe, fencing, pipe fittings, valves, 8-inch <br />flow meter, & appurtenances 7,350.00 <br /> <br />Equipment (diesel powered generator, submersible pump, & <br />miscellaneous tools) 7,060.00 <br /> <br />En~ineerin~ <br /> <br />Coordinating of Test 1,100.00 <br />Evaluation of Test Pumping & letter preparation 4,000.00 <br /> <br />TOTAL $25,370.00 <br /> <br /> <br />