My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Jones and Stokes Associates, Inc.-ICF Consulting Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 Jones and Stokes Associates, Inc.-ICF Consulting Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 2:25:26 PM
Creation date
6/7/2011 2:40:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Jones and Stokes Associates, Inc. a wholly owned subsidiary of ICF Consulting Group, Inc.
PROJECT NAME
Envronmental Consultant for 640 Veterans Blvd - Initial Study Mitigated Negative Declaration for CEQA
RMP File Number
304
Date
6/7/2011
MO Ref
12-013, 12-070
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ICF <br /> INTERNATIONAL <br /> 2.5) to estimate potential noise effects at existing noise - sensitive <br /> receptors, and noise during construction. The project is currently on- <br /> going and is faced with significant community opposition. <br /> Bay Area to Central Valley Program EIR/EIS for the California High - <br /> Speed Rail — California High -Speed Rail Authority, Northern California <br /> Conducted an analysis of the potential for various biologic and <br /> hydrologic impacts utilizing GIS systems in support of a program <br /> level EIR/EIS. The proposed project would involve construction and <br /> operation of hundreds of miles of a high -speed rail network in <br /> multiple counties around northern Califomia. <br /> Orange Park Acres Subarea Master Plan IS /MND —IRWD <br /> Assistant Project Manager. Involved in managing schedule, <br /> deliverables, and client expectations in this on -going project. <br /> Currently coordinating technical staff and assisting in the preparation <br /> of an IS /MND for a series of major upgrades to the existing water <br /> distribution and transmission system in the IRWD Orange Park Acres <br /> (OPA) service area. <br /> San Pedro Waterfront Project EIS/EIS —Port of Los Angeles, Los <br /> Angeles, California <br /> Conducted an analysis of the recreational resources, and assisted in <br /> coordinating a response to public comments. The proposed project <br /> would involve extensive development of a variety of land uses within <br /> the project area, including public waterfront and open space areas, <br /> commercial development, transportation and parking facilities, and <br /> expansion of cruise ship facilities and operations. <br /> Michelson Water Reclamation Plan EIR Addendum —IRWD <br /> Assistant Project Manager. Involved in managing schedule, <br /> deliverables, and client expectations. Coordinated technical staff and <br /> assisted in the preparation of an Addendum to a Final EIR on behalf <br /> of the IRWD for modifications to the Michelson Water Reclamation <br /> Plant (MWRP) Phase 2 and Phase 3 Capacity Expansion Project <br /> and the San Joaquin Freshwater Marsh Enhancement Plan (SJMP). <br /> BRE Properties Transit - Oriented Development EIR—City of Riverside, <br /> Riverside, California <br /> Assisted biologists in mapping on -site vegetation based on detailed <br /> field surveys. Prepared report graphics illustrating project site and <br /> potential resource impacts. <br /> Aaron Carter <br />
The URL can be used to link to this page
Your browser does not support the video tag.