My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 BKF Engineers-Downtown RWC Tentative map
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 BKF Engineers-Downtown RWC Tentative map
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 4:13:56 PM
Creation date
6/7/2011 4:13:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Downtown Redwood City Tentative map.
RMP File Number
304.5
Date
6/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
27. Authority. The individuals executing this Agreement and the instruments <br /> referenced in it on behalf of Consultant each represent and warrant that they have the <br /> legal power, right and actual authority to bind Consultant to the terms and conditions of <br /> this Agreement. <br /> CITY: City of Redwood City, <br /> 1017 Middlefield Road <br /> Redwood Ci , CA 94063 <br /> By: ° ` --- - /c .,, ,mil <br /> Robert B. Bell, Cit Manager <br /> er g <br /> A'\ ST <br /> tkit Al <br /> Sily U' Von:- rlinden, City Clerk <br /> CONSULTANT: BKF Engineers <br /> 255 Shoreline Drive, Suite 200 <br /> Redwood City, CA 94065 <br /> (650) 482 -6300 <br /> Print <br /> *By ('G��� / /� * *By: ��.. 4 <br /> Printed Name.PArij/9• �4e`�e -"' ame: c % J/>e- O " 1 a <br /> Title: 1 "e5/CE-C.9 Title: G -{..-r <br /> If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, <br /> Agreement must be signed by one corporate officer from each of the following two groups. <br /> *Group A. **Group B. <br /> Chairman, Secretary, <br /> President, or Assistant Secretary, <br /> Vice - President CFO or Assistant Treasurer <br /> Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate <br /> seal empowering the officer(s) signing to bind the corporation. <br /> ATTY /AGR/2011.51 BKF Engineers <br /> 52511 <br />
The URL can be used to link to this page
Your browser does not support the video tag.