My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2011 10:49:35 AM
Creation date
1/20/2005 4:05:08 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
1/24/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table A-1 <br />Redwood City Water Financing Plan <br />Policy Assumptions <br /> <br />Policy Assumptions <br /> <br />1 Redwood City is currently overdrafting its potable water supply assurance from SFPUC and <br />faces increasing supply and reliability deficits, especially during drought years. <br /> <br />2 Redwood City has been able to purchase adequate supply to meet its overdraft demands due to <br />a temporary surplus of SFPUC water capacity. The surplus capacity is projected to evaporate a <br />water demands increase from other BAWSCA agencies which are not currently using their fully <br />supply assurance. According to the most recent projections, the BAWSCA water demands will <br />hit full capacity of 184 mgd in 2007-2010. <br /> <br />3 Redwood City anticipates it will be able to purchase adequate supply to meet its overdraft <br />demands for the foreseeable future. However, overdraft water demand will likely be priced at <br />substantially higher rates. During historical SFPUC supply shortages, water usage over allocated <br />levels has been priced at rates as high as 10 times the standard unit rate. <br /> <br />4 Water recycling and related projects are needed to 1) resolve reliability and supply deficiencies <br />for current customer base (1,100 AF deficiency), and 2) provide additional supplies to meet <br />demands of new development (860 AF); total project to provide up to 1,960 AF by 2015. <br /> <br />5 Recycled water supply required for existing water reliability and supply deficits (1,100 AF) will be <br />predominantly funded through water rates. <br /> <br />6 Recycled water supply that will free up potable water capacity for growth (860 AF) to be funded <br />over time by new development through adjustments to existing Facilities Fees and/or creation of <br />a new water supply capacity fee. <br /> <br />7 A 20% reduction in SFPUC water supply due to a drought will currently result in a 30% cutback in <br />the amount of potable water allocated to the City based on the SFPUC's Interim Water Shortage <br />Allocation Plan. Based on historical SFPUC drought pricing, water use in excess of the City's <br />reduced drought allocation may be priced at exorbitant rates, potentially 10 times as high as <br />normal-year SFPUC rates. <br /> <br />8 Redwood City is in the process of implementing an aggressive conservation program to reduce <br />potable water demand. However, conservation measures alone will not be sufficient to solve the <br />City's long-term water supply and reliability deficits. <br /> <br />9 Of all the water supply alternatives available, recycled water is the most reliable new source of <br />supply that can be implemented before 2007-2009. <br /> <br />10 Recycled water rates are assumed to be set at 75% of potable water rates for financial planning <br />purposes and will not be subject to drought rate increases. We recommend that the Council <br />consider the pricing policy for recycled water carefully and in the context of the adopted policy of <br />no mandatory connection requirements to ensure that sufficient voluntary connections are <br />achieved pursuant to approved project Alternative 'TF'. <br /> <br />11 Redwood City will implement project Alternative 'TF' at a revised and refined estimated cost of <br />$84 million over the period 2005 to 2015. The cost estimates for each component of the project <br />account for cost inflation to construction date and include prudent contingency allowances. <br /> <br />12 Redwood City will implement a very proactive program to prepare sites and users for successful <br />long-term use of recycled water, in full compliance with all federal, state and city safety <br />regulations and policies. <br /> <br />BARTLE WELLS ASSOCIA TES <br />F:\Jobs\Redwood City\1921\ \Redwood City Tables 12-20-04\Assumptions 1,12/21/2004,5:48 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.