My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2011 10:49:35 AM
Creation date
1/20/2005 4:05:08 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
1/24/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />$3.1 million for the costs of issuing the bonds (including $2.3 million for a debt service <br />reserve fund). <br /> <br />Water Supply Assurance - In its City Urban Water Management Plan (UWMP), the <br />City Council has previously determined that the City has a relatively low level of water <br />supply reliability. The City currently purchases all of its potable water supply from the <br />San Francisco Public Utilities Commission (SFPUC) via the Hetch Hetchy regional <br />water system. Demand for water has consistently exceeded assured supply of water <br />from the SFPUC over the past six years, with excess demand ranging from a low of <br />approximately 5% of assured supplies to a high of approximately 120/0. There are no <br />adverse consequences to excess demand as long as Hetch Hetchy system supplies are <br />sufficient for all SFPUC customers. However, in the event of a system-wide water <br />shortage, water costs will increase significantly and the supply of water will be <br />drastically reduced. Pursuant to the various agreements it has with the SFPUC, if the <br />SFPUC declares a 100/0 water system shortage, the City will be required to reduce <br />water use by 17.5%. This reduction would be accomplished through economic means <br />by increasingly higher water use penalties that would be imposed on the City by the <br />SFPUC as the City's water use exceeded its water allotment. It is expected that these <br />penalties would be passed on to consumers in order to induce them to curb their water <br />use. Moreover, in its UWMP the City has determined that the City's water reliability will <br />deteriorate in future years. Total water demands on the Hetch Hetchy water system are <br />expected to grow and water shortages are expected to increase in both frequency and <br />magnitude. Additionally, the City's wholesale cost of water is expected to increase by <br />approximately 1 000/0 by FY 2011/12 as the SFPUC passes future capital costs on to <br />regional water purchasers. <br /> <br />Confronted with a relatively low level of water supply reliability and projected increasing <br />wholesale water costs, the City initiated planning efforts to meet its goals of providing its <br />water customers with high quality water, at a high degree of reliability, at the lowest <br />possible cost. In FY 2001/02, the City augmented its conservation program by <br />implementing "active" water conservation measures and began investigating the <br />feasibility of implementing a water recycling project for landscape irrigation and <br />industrial uses in order to reduce the City's dependence on SFPUC water. <br /> <br />The City Council authorized staff to proceed with the water recycling project in August <br />2003 and approved the Water Financing Plan on January 24, 2005. <br /> <br />Water Recycling Project - Phase 1 of the project consists of the construction of water <br />recycling facilities (treatment improvements, disinfection, storage and pumping facilities) <br />to be constructed at the South Bayside System Authority (SBSA) treatment plant; a <br />pipeline distribution system to be constructed east of US Highway 101 in Redwood <br />Shores and in the Seaport, Bayfront, and Skyway commercial and industrial areas of <br />the City; customer site retro-fits; and the installation of synthetic turf play fields to reduce <br />the use of potable water for irrigation purposes. This portion of the project will be <br />implemented through 2010, and will be capable of delivering up to 1,960 acre-feet of <br />recycled water per year. Total Phase 1 estimated costs are approximately $71.3 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.