My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-07-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2006 9:21:49 AM
Creation date
7/20/2006 1:07:25 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/24/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 7A <br /> Page 15 <br />Transition Zone (Zone B): Identifies the area in which improvements <br />may be permitted, subject to City review (please refer to subsection "E", <br />Engineering Standards & Construction Criteria). Bulkheads with a <br />maximum 4-foot width, two (2) cable stayline anchors, and landscaping <br />header boards (less than 4-inches in height) may be located within this <br />zone. All other structural improvements within this zone require plans to <br />be prepared by a licensed Civil Engineer and are to be reviewed and <br />approved by the City in accordance with this policy. Typically this area <br />extends from the top of bank, three (3') feet into property. (See Figure 1 - <br />Typical Lagoon Bank Section). ",fJ~<>. <br /> :.If}\7fr1~ , <br />Landscaping is permitted within this zone, bu.!,JMject to City review and <br />approval if planter beds or other structural ~ffi~!IS are necessary. <br /> 0'" .'cl~?;;;"'. <br />For properties with a vertical relaln';lJl'<- Flgu~~TYPlcallagoon <br />Bank Section) the Transition Zone,,, 'Cds from the end Of~ TP-W Zone <br />. =I~S ..:)~::;e th:"~~\1~5~~:n~n ~einV~~: <br />improvements may be permitted su .__-,,:.~City review (please refer to <br />subsection "E", Enginee"~l~ndards ;{ffi,struction Criteria). <br /> \t~~it~-~:-"'r:~~.i~~~~0.~(~.;~. '. __ .. "~~~{0~~>': <br />Waterfront Prooertv: ~,~cf~,area:::~ard of the "Transition <br />Z?ne" (Zone. B),,~~y!~iCh irrifjeve ,a/;,~,,'ic'i;~.~<,,~~:;~per~itted in accordance <br />With the requl~~$Plthe R~ Clty~g Orchnance and alt other <br />applicable ,~i1g an~'ire Co~uirements. <br />.r~~~I~~~" ."~~~~ ';H~~~ <br />r3~);~\e3~,r:~~:':':. . ~'~,~~:~th~~~:~~ ~~e~=~:I~m ~y:~:~ <br />A~~ ~~~:t:I~":::::':''::l.beYOnd the lop of <br />4~~~" ~~~f.~-. ~~&h,~ <br />.;t~f'; Zones: dl~nd/~ft"l which results in the alteration of the existing <br />g '~;",.-!" as originlengineered, is strictly prohibited unless prior approval <br />is 0~1!d from "., ':' City in accordance with provisions of this policy. <br />'~':'~~'~'" ,,!.f~W(~r <br />On-sjte"'~?~~hall be directed towards the stormwater system within <br />the public rigI1i-of-way (i.e., the street) where possible. In situations where <br />the existing drainage system installed during original construction is still <br />operational, drainage may continue to be directed into the lagoon. <br />However, where the original drainage systems have been altered through <br />re-grading or other improvements to the property, so that the existing <br />system does not function properly, the on-site drainage shall not be <br />directed over the lagoon bank. Unmanaged drainage will result in further <br />erosion of the lagoon banks and contributes to the threat of slope failure. It <br />can also adversely impact water quality. <br /> 9 <br /> ._.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.