Laserfiche WebLink
1 ' � �� <br /> �� Regarding the last change, staff originally wanted a minimum of 80% of "occupied' <br /> ground level space to promote pedestrian activity. This ocxupied space could have <br /> included residential or commercial usE s. The intent was to "wrap" the e�cposed two or <br /> three-story parking garage facades with active and interesting spaces because the City <br /> wished to promote a lot of pedestrian acti� ity within the project, and people do not like to <br /> walk along streets with little or no active uses (meaning houses, stores and other usss <br /> that promote people being in the area). The developer argued that their pian, as <br /> designed could not achieve the 80% standard, and the Planning Commission agreed to <br /> modify this condition so as to allow a minimum averdge of 50% occupied space for the <br /> entire build-out condition. This means that some of the building phases could technically <br /> be below the 50% requirement (e.g. portions of Pete's Harbor) and some could be <br /> higher (e.g. portions of Peninsula Marina). But in no case shall the entire build-0ut be <br /> below an average of 50%. The definition of "occupied" ground level space was further <br /> expanded to include not only commercial or residential uses, but also could include <br /> attractive stairs, patios, courtyards, and pedestrian entrances to garages. <br /> The staff expressed concem about the extent of inactive ground floor space in the <br /> current project design. It is noted, however, that the Precise Plan is a concept-level <br /> document and that the actual project approvals for the various phases of the project will <br /> occur when the developer submits applications for Planned Community Permits <br /> The Precise Plan sets minimum requirements for a conceptual and large-scale design <br /> such as MSV. The implementing tool will be the Planned Community (PC) Permit. The <br /> PG permit will be required at each phase of development. <br /> Density <br /> The current General Plan designation does not permit MSV to be built as proposed. <br /> Both the 1990 General Plan land Use Element and accompanying land use map list the <br /> maximum net density allowed in Redwood City as 40 units per net acre�. The projecYs <br /> net residential density is 59 units per net acre or a 47% increase over existing � <br /> standards. <br /> While the applicant indicates the intention to build out the entire project, the City has no <br /> way to guarantee that this will occur. As a result, the Precise Plan is drafted in a <br /> manner that assures a proper mix of uses and that the level of development and density <br /> proposed matches planned infrastructure improvements. <br /> The Precise Plan and the General Plan Amendment permit a baseline density of 40 <br /> units per net acre but also allow a greater density (e.g. 59 units/net acre or 1,930 on-site <br /> units) under the Planned Community Permit, coupled with the Development Agreement. <br /> The City will have to make certain findings to warrant this higher density for the project. <br /> The project, at each phase, would have to demonstrate at least three of the following: <br /> 6 Planned Community PertniLs are defined in Article 52 of the Zoning Ordinance and are the mechanism for approwal <br /> of the'various phases of a project approved by a Precise Plan. <br /> ' Land Use Element of the Redwood City SVategic General Plan. Page 6-5. <br /> 7 <br />