Laserfiche WebLink
�.�-33 <br /> ;, primary goal of the Project. A project with substantially fewer units would also reduce or <br /> _ eliminate other benefits of the Project identified in the Statement of Overriding <br /> Considerations. The remaining impacts, though potentially significant, are therefore <br /> unavoidable. <br /> D. "SmarP' Growth <br /> Potential Impact: Absence of parks facilities, of a transit link to a local or <br /> regional corridor or hub, or retail commercial space to serve the convenience needs of <br /> Project residents and businesses or a specific and substantial below market rate <br /> housing component could conflict with local or regional land-use policy and create a <br /> potentiaily significant environmental impact under "smart" growth policies [Impact 4-3]. <br /> A related water supply impact is discussed in Section VII(A) below. <br /> Mitigation: The Precise Plan specifies an appropriate park space and <br /> recreation credits for Project open space and water areas, and requires new park area <br /> within the Project large enough to meet the ProjecYs needs as determined by the City <br /> (Mitigation 10-8). The Precise Plan and Project conditions of approval require that the <br /> Project sponsor a transit connection to downtown Redwood City and also that Project- <br /> generated trips be monitored periodically throughout development of the Project and <br /> that a defined reduction in off-site trips be achieved through transit and/or other means <br /> (Mitigations 4-3, 7-7). The Precise Plan and Project Development Agreement also <br /> require that the Project contain retail commercial space in a specfied amount and by a <br /> specified stage of development, to serve the needs of residents and Project businesses. <br /> — The Precise Plan also specifies that the Project provide at least 15% affordable <br /> housing, including 5% of its units affordable to very low income households. <br /> Findings: The identified mitigation measures are feasible and reduce the <br /> ProjecYs park impacts to a level which is not potentially environmentally significant, <br /> while also bringing its transit measures, on-site retail commercial development and <br /> affordable housing components in line with existing "smart" growth policies so that there <br /> is no potentially environmentally significant impact created by failure to comply with <br /> those policies. <br /> II. VISUAL QUALITY <br /> A. Heiqht <br /> Potential Impact: The Project would contain a number of buildings <br /> significantly higher than those in the vicinity (EIR Impact 5-1). <br /> Mitigation: The Precise Plan requires a carefully-drafted set of design <br /> principles, including setbacks, tapering heights, building spacing, floor area limits and <br /> surface and fa�ade detailing, which will significantly reduce perceived height of the <br /> Project, and distribute its taller buildings so that visual impacts on adjacent properties <br /> will be reduced (Mitigation 5-1-2). <br /> �2ss�oni�sz�a.2 3 <br /> Atty/Reso/Reso.1470 <br /> 052004 <br />