Laserfiche WebLink
■ <br /> erna ��� u m mar <br /> , <br /> le Water Cost Relative <br /> Demand to Alternative E <br /> Item Reduction F/Y) ($) <br /> Recycled Water <br /> Realignment of Recycled Water Piping 1,68 (5,100,000) <br /> Downtown Cinema Dual Plumbing 23 200,000 <br /> Subtotal 1, 710 0, 000) <br /> Synthetic Turf Playing Fields <br /> Red Morton Park <br /> Sandpiper Park <br /> Marlin Park <br /> Hawes Park <br /> Hoover Park <br /> Sequoia High School <br /> Canada College <br /> Subtotal <br /> Existing Groundwater Use <br /> Sequoia High School <br /> Subtotal <br /> Additional Conservation <br /> Pre-Rinse Spray Nozzles <br /> Evapotranspiration (ET) Controllers <br /> Hot Water Recirculation Pumps <br /> Subtotal <br /> Totals <br /> 22 March, 2004 <br /> 51 <br /> 23 <br /> 12 <br /> 9 <br /> 25 <br /> 14 <br /> 16 <br /> 150 <br /> 57 <br /> 57 <br /> 33 <br /> 46 <br /> 6 <br /> 85 <br /> 2,5 <br /> 737, <br /> 877,0 <br /> 515,000 <br /> 0 <br /> 0 <br /> 0 <br /> 4, 669, 000 <br /> � i <br /> 0 <br /> 145,000 <br /> 100,000 <br /> 245, 000 <br /> 2,002 14,000 <br /> Recycled Water Task Force Final Report <br />