My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-04-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-04-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:07:06 PM
Creation date
4/23/2004 8:27:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4� � c. — � c� <br /> c;��m� sv�e�s�� 6 <br /> 1. Design of planter or other device at parldng gazage entrance <br /> 2. Special sidewalk design trea�nent neaz garage enuance, bulb outs etc. <br /> 3. Finalize location of all street fiunishings <br /> E. Middlefield Road - detailed layout & design <br /> 1. Typical sidewalk w/concrete paving pattem <br /> 2. Comer dehils (Jeffeison at Middlefield Road) <br /> 3. Trees in parldng details including plant materiais, curbing detail <br /> 4. Crosswalk areas <br /> 5. Finalize location of benches, hash receptacles, and street trees <br /> F. Format and transmit electronic files ro Slooten Consulring and SFE <br /> G. Provide direcrion, respond w quesaons from design team subconsultants <br /> Task 10. Materials and Finishes Selections - research, speciTicsHon sheets, samples & <br /> mock-up <br /> A. Stone Paving materials; dining terrace, bands, entryways, street <br /> B. Concrete Paving; custom colors, banding and special finishes <br /> C. Precast concrete colors, materials, finishes <br /> D. Metal paint colors, finishes <br /> E. Coordinaeon sessions w/ manufacmrer reps (at F'I'B) <br /> F. Coordinate w/ conhactor on conswcted paving mock-up sample, provide general directions <br /> G. Coordinate follow-up modificarions as required <br /> Task 11. Prepare/assemble specification notes; transmit to SFE <br /> Task 12. 75% Submittal <br /> A. Streetscape plans & specifications Qualiry Control <br /> I. Receivelreview sinele set of streetscape team drawings and specificaeons from <br /> Slooten Consulring <br /> 2. Draft and Transmit FTB comments to PS&E team <br /> 3. 7 elephone follow-up with team members to review FI'B comments <br /> B. Custom fumishing Quality Control <br /> 1. Receiveireview drawings and specifications from production architect <br /> 2. Meering with production architect [o discuss FTB commenu <br /> C. Attend 75% Review Session Meedng in Redwood Ciry (Meeting #2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.