Laserfiche WebLink
,� � .. ■ � ' ■ i �� <br /> 8 •C,- I � <br /> Cinema Smetscape q <br /> A. On-going coordination with ESA <br /> B. Prepaze supplemrntal informaeon regazding streetscape and courthouse plaza design, transmit <br /> to ESA <br /> C. Attend preliminary analysis review meeting (at FTB) <br /> D. Coordination wind mirigation recommendarions as necessary <br /> 1. Attend wind runnel analysis at ESA testing site <br /> Task 2. Presentation to Ciry Council (January 04) <br /> A. Prepare presenration materials <br /> B. 7ravel / attend meering in Redwood Ciry <br /> Task 3. Concept Level Cost Estimate update (Completed 12/8/03) <br /> A. Prepaze concept-level package and transmit to Wentz Group <br /> B. Attend follow-up mee6ng at Wena Group to discuss concept-level design details <br /> C. Follow-up reseazch. coord with Cinema project team <br />