My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-07-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-07-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:58:14 PM
Creation date
7/22/2004 2:42:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
g6i - 3 <br /> All of the legal, operational and financial details of the long-term partnership arrangement <br /> between the two agencies are embodied in the Agreement for Production and Delivery of <br /> Recycled Water between the South Bayside System Authority and the City of Redwood <br /> City. The Agreement and companion Lease are considered the cornerstone of the Project <br /> implementation process. <br /> Alternative <br /> Provide alternative direction. <br /> Fiscal Impact <br /> The preliminary, estimated cost of the "Alternative TF" Project as recommended by the <br /> Recycled Water Task Force is $43.6 million. Refined cost estimates are now being <br /> assembled based on preliminary engineering design completed since the Task Force <br /> reported to Council in March. <br /> Should the City Council approve the Agreement, this will trigger a City reimbursement to <br /> SBSA for completed, Commission-authorized planning, environmental and engineering <br /> services in the amount of $409,443. Subsequent reimbursements for engineering, <br /> construction of facilities and construction management are estimated at $14 million over <br /> the next two years. Staff will recommend via an updated financing plan that the City <br /> Council authorize the issuance of revenue bonds for the SBSA work and the first phase of <br /> City distribution system and customer site retrofits in the fall of 2004. The bonds will be <br /> paid off over a 25-30 year period, utilizing revenues created by increasing water rates to all <br /> Redwood City customers and by significantly increasing connection fees for new <br /> development. <br /> The approval of the Lease commits the City to estimated annual rental costs of $19,250, <br /> beginning January 1, 2006. Rent will be adjusted by CPI index at three year intervals. <br /> All direct operation and maintenance costs incurred by SBSA in producing and delivering <br /> recycled water, along with an overhead contribution to SBSA, will be paid fully and <br /> completely by Redwood City's Water Enterprise Fund. Staff estimates that costs for the <br /> first year of recycled water production (FY 2006/07) will be $30,000 to $50,000, rising to a <br /> projected annual cost of $330,000 by FY 2008/09, when the project is expected to be <br /> delivering approximately 650 Acre Feet per year to 57 customers. <br /> These on-going, operational costs will be covered by revenues generated by the sale of <br /> recycled water. <br /> Prior to the Council's approval of the project, and the subsequent Task Force report and <br /> recommendations, staff had estimated that annual water rate increases ranging from 6% to <br /> 9% per year for 10-13 years would be required to generate the additional revenues needed <br /> to finance the project. A portion of connection fees collected during that time (could be as <br /> much as 40% of total costs) would offset those impacts. <br /> � <br /> / / � <br /> , , <br /> � / <br /> /�. �'� <br /> Peter Ingram Ed Everett <br /> Director, Public orks Services City Manager <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.