My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-07-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-07-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:58:14 PM
Creation date
7/22/2004 2:42:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
g •�i - �- <br /> cost-effectively deliver more Recycled Water in the future, if needed, up to an <br /> annual delivery rate of 3,238 acre feet. <br /> F. The purpose of this Agreement is to set out the understanding of SBSA and City <br /> as to their respective roles and responsibilities in the design, construction and <br /> operation of the Project. <br /> 2.0 DESIGN OF FACILITIES <br /> 2.1 DesiQn of Facilities Located on SBSA's Property <br /> SBSA will be solely responsible for the engineering design and preparation of <br /> plans, specifications and Construction Contract Documents for those Project <br /> facilities to be located on SBSA's property and owned by SBSA. These facilities <br /> are described under Items l, 2 and 10 in Attachment One. <br /> SBSA also will be responsible for the engineering design and prepazation of <br /> plans, specifications and Construction Contract Documents for those Project <br /> facilities to be located on SBSA's property and owned by City. These are <br /> described under Items 3 through 9 and 11 in Attachment One. <br /> The engineering design for both City-owned facilities and SBSA-owned facilities <br /> shall conform to City's design criteria, as described in Attachment Two. <br /> SBSA has heretofore undertaken various Project planning and design tasks, with <br /> City's approval, that pertain to facilities to be located on SBSA's property. Those <br /> tasks, the responsible engineering firms, and associated costs aze listed on <br /> Attachment Three. <br /> City ratifies its approval of SBSA's award of the contracts and issuance of the <br /> task orders listed on Attachment Three, and agrees to reimburse SBSA for the <br /> costs heretofore incurred by it, as provided in Section 73.1. <br /> -3- � 09� 3�a.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.